Similar Projects
Highland Avenue Gas Station
Demolition, New Construction, Infrastructure - 3,353 SF
Conception
$400,000 CJ est. value
Salem, MA 01970

Highland Avenue Gas Station
Demolition, New Construction, Infrastructure - 3,353 SF
Conception
$400,000 CJ est. value
Salem, MA 01970

Washington Street Multifamily
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Ipswich, MA 01938

Haverhill Street Clinic Buildings
New Construction, Infrastructure - 48,180 SF
Design
$28,000,000 CJ est. value
Andover, MA 01810

Cliftondale Square Shared Streets and Spaces Project
Infrastructure
Post-Bid
$99,877 est. value
Saugus, MA

Hot Mix Asphalt Paving
Infrastructure
Post-Bid
$209,700 est. value
Beverly, MA

Construction of the New Public Works Facility - General Bid
New Construction, Infrastructure
Results
$14,677,723 CJ est. value
Rockport, MA 01966

Construction of the New Public Works Facility - General Bid
New Construction, Infrastructure
Results
$14,677,723 CJ est. value
Rockport, MA 01966

Grove Street Apartments - Site Development Only
New Construction
Construction
Salem, MA 01970

Market Street Mixed Use
Addition, Demolition, Renovation, Infrastructure
Construction
$3,800,000 CJ est. value
Ipswich, MA 01938

Executive Place Warehouse Development
New Construction, Infrastructure - 167,610 SF
Pending Verification
$40,000,000 CJ est. value
Andover, MA 01810

Executive Place Warehouse Development
New Construction, Infrastructure - 167,610 SF
Pending Verification
$40,000,000 CJ est. value
Andover, MA 01810

Good Manufacturing Practices (GMP) Lab Facility
New Construction, Infrastructure - 100,000 SF
Conception
$20,000,000 CJ est. value
Andover, MA 01810

Lafayette Street Mixed Use Development
Demolition, New Construction, Infrastructure - 41,500 SF
Design
$56,000,000 CJ est. value
Salem, MA 01970

Asphalt Pavement Reclamation
Infrastructure
Post-Bid
$411,300 est. value
Beverly, MA

Last Updated 04/26/2023 05:10 PM
Project Title

Cashman Park Site Improvements - PK008 - City of Newburyport

Physical Address View project details and contacts
City, State (County) Newburyport, MA 01950   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $810,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 26, 2023, project is currently bidding for a contractor. This project is currently in the City of Newburyport Capital Improvement Plan fiscal year 2023-2027. Some funding for this project is allotted in the city's capital improvement plan for fiscal year 2024 and the rest is allotted towards fiscal year 2026. The closed solicitation has been included below for reference. Improvements will be done in phases which include: Phase one- Includes but is not limited to: pressure washing the entire tennis and basketball court areas, removing existing failed crack repair system, installing Riteway Crack Repair System over all failed crack repair system that has been removed and all new structural cracks, filling hairline cracks with latex crack fillers and blending, painting the entire court surface with one coat of California Products black acrylic resurfacer (or approved alternate), painting the entire court surface using two coat California Products Deco Turf Ultra Performance full acrylic playing surface (or approved alternate), painting one set of tennis lines and two sets of pickleball lines with California Products (or approved alternate) textured white line paint per USTA standards, painting two sets of basketball lines with California Products (or approved alternate) textured white line paint, furnishing and installing 80’ Har Tru Royale (or approved alternate) open mesh black 9’ windscreens in two pieces on river side of fence, furnishing and installing 8’x16’ green Bakko Economy Flat Series (or approved alternate) backboard to short side of fence, and any potential add alternates as listed. All work incidental thereto shall be in accordance with the project manual, design plans and specifications and attached hereto, which are incorporated herein by reference. Additionally, the contactor must adhere to all other requirements of this bid package and written specifications, inclusive. Next phases will include: Walkway - Resurfacing walkway at Merrimac St entry walkway down to waterfront, a high priority need for accessibility. Playground equipment - Replacement of aging playground structures. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents