Similar Projects
Hillside Subdivision
New Construction - 883,244 SF
Conception
$10,000,000 CJ est. value
Oakland, CA 94605

Oak Knoll Development
New Construction - 118,400 SF
Design
Oakland, CA 94605

La Playa Commons
New Construction - 235,090 SF
Design
Hayward, CA 94545

Santa Rita Jail Housing Unit 8W, 25N, AND 35N Security Screen Installation
Renovation
Sub-Bidding
$235,000 CJ est. value
Dublin, CA 94568

Peralta Community College - Wide Deep Cleaning and Floor Waxing
Alteration
Post-Bid
Oakland, CA 94606

Wiley Manuel DA Carpet Replacement
Alteration
Post-Bid
Oakland, CA 94607

FEMA Region 9 Non-Static VCT Flooring
Term Contract
Results
Oakland, CA 94607

Gym Floor Refinishing
Term Contract, Alteration
Results
$100,000 est. value
Fremont, CA

Bunker Hill Development
New Construction
Pending Verification
Hayward, CA 94545

Poppy Lane Homes
New Construction
Pending Verification
San Leandro, CA 94578

FEMA Region 9 Floor Core Services
Alteration
Post-Bid
Oakland, CA 94607

Hart Middle School Gym Floor and Bleachers Repair and Resurfacing
Renovation, Alteration
Results
$500,000 est. value
Pleasanton, CA 94588

SCS Dublin Mixed-Use Development
New Construction - 265,000 SF
Pending Verification
$10,000,000 est. value
Dublin, CA 94568

Interior Painting, Installation of Protective Wall Covering, and Replacement of Rubber Cove Base at the Hayward Department of Motor Vehicles (DMV) Field Office
Term Contract
Post-Bid
$45,000 est. value
Hayward, CA 94544

Hayward High School Modernization - Gym Floor Replacement
Alteration
Results
$1,500,000 est. value
Hayward, CA 94541

Last Updated 08/08/2022 10:35 AM
Project Title

Santa Rita Jail Housing Unit 25 Floor Replacement

Physical Address View project details and contacts
City, State (County) Dublin, CA 94568   (Alameda County)
Category(s) Residential, Single Trades
Sub-Category(s) Flooring, Single-Family Homes
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $129,969 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 8, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Santa Rita Jail Housing Unit 25 Floor Replacement Estimated Award Date 08/18/2022 Site clearance takes approximately 10 business days to process. If you do not have site clearance, please fax the completed security clearance form to: (925) 828-4151. All participants to meet at main lobby entrance at the top of the ramp and are required to sign in at the site Contract Duration Begins September 15, 2022 00 55 00 Notice to Proceed Contract Duration Ends March 16, 2023 MBE PARTICIPATION SUBCONTRACTING - 15% GOAL WBE PARTICIPATION SUBCONTRACTING - 5% GOAL LBE PARTICIPATION GOALS -60% GOAL Last Day for Receipt of Questions - June 10, 2022, by 5:00 p.m. 10 business days before date for Receipt of Bids

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents