Similar Projects
Landers Center Expansion
Addition, Demolition, Renovation, Infrastructure - 175,000 SF
Design
$35,000,000 CJ est. value
Southaven, MS 38671

Silo Square - Phases 3 and 4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Southaven, MS 38672

Street Improvements 2022 Gaines Road and Norman Road - Rebid
Infrastructure
Bidding
$1,600,000 CJ est. value
Corinth, MS 38834

RE-BID Claiborne County Family Health Center Administrative Office Building
New Construction, Infrastructure
Bidding
$381,000 CJ est. value
Port Gibson, MS 39150

Quarantine Units Renovations - Utica Campus
Renovation - 3,000 SF
Post-Bid
$750,000 to $1,200,000 est. value
Utica, MS 39175

Johnson Science Tower and Bobby Chain Tech Elevator Modernizations
Renovation
Post-Bid
Hattiesburg, MS

Student Services Building
New Construction
Results
$15,000,000 est. value
Clarksdale, Jackson, MS 38614

Ellzey Hall Renovations
Renovation
Results
Wesson, MS 39191

Rowan Hall Second Floor Renovation
Renovation
Construction
$463,700 est. value
Lorman, MS 39096

Velocys Bayou Fuels Project - Belwood Industrial Park
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Natchez, MS 39120

The Cascades
New Construction, Infrastructure - 400,000 SF
Pending Verification
$385,000,000 CJ est. value
Olive Branch, MS 38654

Homeowner Rehabilitation Project
Demolition, New Construction, Renovation, Infrastructure
Bidding
$202,925 CJ est. value
Vaiden, MS 39176

Remodeling Two Restrooms
Renovation
Post-Bid
Cleveland, MS 38733

DCS Accessible Playground Additions
Addition
Results
$242,482 est. value
Olive Branch, MS 38654

Scannell Properties Industrial Development / Olive Branch
New Construction, Infrastructure - 488,000 SF
Pending Verification
$262,000,000 CJ est. value
Olive Branch, MS 38654

Last Updated 01/09/2023 03:03 PM
Project Title

Ranger Football Field Improvement Project Phase 2

Physical Address View project details and contacts
City, State (County) Senatobia, MS 38668   (Tate County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2020 , Construction documents
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 1, 2019, the bids received was rejected.** Ranger Football Field Improvement Project Phase 2. Work shall be substantially complete on or before June 26, 2020. Contractor shall commence work on or before a date to be stipulated in the Notice to Proceed. It is estimated that the Notice to Proceed shall be November 14, 2019. The contract will be awarded to the lowest and/or best bid from a responsive responsible and qualified Bidder. Should no award be made within forty-five (45) calendar days after opening of proposals, all proposals may be rejected and all proposal guaranties returned, unless the lowest responsive responsible qualified bidder, at the request of the Owner, agrees in writing to a longer delay. Bid bond, signed or countersigned by a Licensed Mississippi Agent, or Mississippi Non-Resident Agent licensed to do business in the State of Mississippi, with Power of Attorney attached, or Cashier's check or Certified check for five percent (5%) of the total bid, payable to Northwest Mississippi Community College, must accompany each proposal. Bidders are hereby notified that any proposal accompanied by letters qualifying in any manner the condition under which the proposal is tendered will be considered an irregular bid, and such proposals may not be considered in making the award. Northwest Mississippi Community College reserves the right to waive any irregularities and to reject any and all bids if considered not in the best interest of Northwest Mississippi Community College.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Selective Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents