Similar Projects
Rodney Reconstruction Phase 2 - City of Helena
Infrastructure
Conception
$1,126,284 CJ est. value
Helena, MT 59601

8th / 9th & Dakota Rehabilitation - City of Helena
Infrastructure
Conception
$600,000 CJ est. value
Helena, MT 59601

Westside Woods
New Construction, Infrastructure
Design
$65,000,000 CJ est. value
Helena, MT 59601

2023-2025 Rid Concrete/asphalt Repair
Infrastructure
Bidding
$500,000 CJ est. value
Upper Ellis Place, MT 59648

Upper Tenmile Creek Mining Area Superfund Site
Infrastructure
Bidding
$500,000 CJ est. value
Helena, MT 59601

Lincoln Road Overlay and Chip Seal
Infrastructure
Post-Bid
$400,000 CJ est. value
Helena, MT 59601

Trail Creek Salvage Road Work
Infrastructure
Post-Bid
$300,000 CJ est. value
Helena, MT 59601

Edna Mountain Returns Piling and Scarification
Infrastructure
Results
$485,000 est. value
Helena, MT

MLC Sewer & Water System Improvements
Infrastructure
Results
$386,900 CJ est. value
Helena, MT 59602

2022 Chip Seal
Infrastructure
Construction
$582,933 CJ est. value
Helena, MT 59601

Commodities Warehouse Dry Storage and Freezer Addition / DPHHS
Addition, Demolition, Infrastructure
Construction
$1,846,000 CJ est. value
Helena, MT 59601

Maverik #341 / Helena
New Construction, Infrastructure - 5,951 SF
Pending Verification
$1,600,000 CJ est. value
Helena, MT 59601

The Capital
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Helena, MT 59602

8th / 9th & Dakota Re-route Phase II - City of Helena
Infrastructure
Conception
$850,000 CJ est. value
Helena, MT 59601

New Low-Side Housing and Associated Campus Projects
New Construction, Infrastructure
Bidding
$211,640,000 CJ est. value
Helena, MT 59601

Last Updated 06/14/2023 11:07 AM
Project Title

Black Sandy State Park Bank Stabilization

Physical Address View project details and contacts
City, State (County) Helena, MT 59601   (Lewis and Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $33,787 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Project Consist of stabilizing approximately 236 LNFT of shoreline using a pine bow fascine and willow stabilization with coir wrapped soil to include willow cuttings with a soil layer wrapped with biodegradable erosion control fabric. The project generally includes stabilizing the bank along the shoreline using a pine bow fascine & willow stabilization with coir wrapped soil which will consist of willow cuttings with a soil layer wrapped with biodegradable erosion control fabric (ECM). Above the fascine layers the soil will be sloped back at 1.5H:1V to meet existing grade. The slope area will be seeded and covered with additional biodegradable ECM. Timbered steps will also be constructed to allow safe public access down to the water. All labor and materials and other incidentals shall be provided by the contractor. All Bidders should satisfy themselves as to the construction conditions by personal examination of the site described in this document. Bidders are encouraged to make any - investigations necessary to assess the nature of the construction and the difficulties to be encountered, see General Conditions. Any defective work or nonconforming materials or equipment that may be discovered at any time prior to the expiration of the warranty period, shall be removed and replaced with work or materials conforming to the provisions of the Contract Documents, see General Conditions, Article 12. Failure on the part of the Project Representative to condemn or reject bad or inferior work, or to note nonconforming materials or equipment on the Contractors submittals, shall not be construed to imply acceptance of such work. The Owner shall reserve and retain all its rights and remedies at law against the Contractor and its Surety for correction of any and all latent defects discovered after the guarantee period (MCA 27-2-208). Only the Project Representative will have the authority to reject work which does not conform to the Contract Documents. Engineers Project Cost Estimate: Approximately $34K The Technical Specifications as found in Montana Public Works Standard Specifications (MPWSS), Seventh Edition, April 2021 Addendum; are hereby incorporated by reference and made a part of this Contract: Incorporation of Montana Fish, Wildlife & Parks Technical Specifications and Modifications to MPW Technical Specifications. This work also includes conserving, placing, and finishing topsoil placement at designated areas on the project drawings or as directed by the Engineer.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents