Last Updated | 08/08/2023 05:53 PM |
Project Title | Reconstruct Water Distribution System - Ellicott Quad |
Physical Address | View project details and contacts |
City, State (County) | Buffalo, NY 14202 (Erie County) |
Category(s) | Education, Heavy and Highway, Sewer and Water |
Sub-Category(s) | College/University, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $10,811,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The State University Construction Fund (SUCF) is seeking Statements of Qualifications (SOQs) from consultants to provide design and construction administration services for the Reconstruct Water Distribution System - Ellicott Quad at the University of Buffalo, State University of New York. The project will replace approximately 8,300 lineal feet of underground, large diameter water main, and approximately 1,400 lineal feet of building interior, large diameter water main. The new system must accommodate peak domestic plus anticipated fire flows of all structures within the Quad. The project shall include a full hydraulic analysis and system modelling. This project will modernize and provide adequate water for the demands of fire safety, and potable water needs for all occupants. The Project will provide a comprehensive replacement of all underground water mains, valves, fire hydrants, and fittings. The project includes the replacement of the in-building water main feed, and associated valves and fittings. Associated in-building work include architectural modifications of walls, and mechanical/electrical systems. Other work includes replacement of exterior ground finishes including asphalt parking areas, concrete plaza and hardscapes, and grassed lawn areas. The construction value is estimated at approximately $10,811,000. Questions regarding this opportunity should only be emailed to SUCF.ConsultantProcurement@suny.edu. The deadline to submit questions is August 4, 2023 The project will replace approximately 8,300 lineal feet of underground, large diameter water main, and approximately 1,400 lineal feet of building interior, large diameter water main. The new system must accommodate peak domestic plus anticipated fire flows of all structures within the Quad. The project shall include a full hydraulic analysis and system modelling. This project will modernize and provide adequate water for the demands of fire safety, and potable water needs for all occupants. The Project will provide a comprehensive replacement of all underground water mains, valves, fire hydrants, and fittings. The project includes the replacement of the in-building water main feed, and associated valves and fittings. Associated in-building work include architectural modifications of walls, and mechanical/electrical systems. Other work includes replacement of exterior ground finishes including asphalt parking areas, concrete plaza and hardscapes, and grassed lawn areas. Question Deadline 08/04/2023 Contract term: 10/30/2024 Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Service-Disabled Veteran-Owned Business Contracting Goal: 6% |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |