Similar Projects
Camden County Tech Gloucester Township HVAC & Boiler Replacement
Alteration
Bidding
Gloucester Township, NJ 08081

HVAC Building Upgrades
Term Contract
Bidding
Oaklyn, NJ 08107

HVAC and Mechanical Products
Term Contract
Post-Bid

Hydrogen Peroxide Air Filtration & Disinfection Products
Post-Bid

Contract 5 - Wing Air Handling Unit Addition at the Haddonfield Memorial High School
Results
$1,500,000 est. value
Haddonfield, NJ 08033

2020 HVAC Improvements at Various Locations
Results
$2,949,376 est. value
Cranbury, East Rutherford, Kearny, Milltown, Mount Laurel, New Brunswick, Runnemede, Sayreville, Swedesboro, Westampton, Woodbridge, NJ

Center for Family Services Request for HVAC Services
Term Contract
Post-Bid
Camden, NJ 08105

Auditorium HVAC Replacement at Voorhees Middle School
Results
Voorhees, NJ 08043

Weatherization Energy Conservation Project 2021-2022
Post-Bid

HVAC Filters
Results
Haddon Heights, NJ 08035

Installation of 11 low voltage UV sanitizing modules in existing HVAC equipment
Alteration
Post-Bid

HVAC Filters
Results
Pennsauken, NJ 08110

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Maintenance, Servicing and Repair of Blowers and Air Strippers
Results
Pennsauken, NJ

HVAC Service and Mechanicals
Alteration
Post-Bid
NJ

Last Updated 03/31/2022 01:24 PM
Project Title

2021 Community Center HVAC Replacement

Physical Address View project details and contacts
City, State (County) Cherry Hill, NJ 08002   (Camden County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: In general, the Scope of Work for this project will consist of the following: Demolish existing air handling unit and condensing unit that serves the community center. Demolish two (2) existing boilers and all related hydronic piping. Demolish all associated piping and indicated ductwork. Provide one (1) packaged rooftop unit mounted on grade to serve the community center, including indicated new supply and return ductwork, diffusers, controls, dampers, controls, etc. Provide new gas piping to supply the new packaged rooftop unit. The new equipment shall be seamlessly integrated into the existing building management system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents