Similar Projects
New Brunson Elementary School
New Construction
Conception
Winston-Salem, NC 27101

Chipotle
Renovation - 11,700 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Winston-Salem, NC 27127

West End
New Construction - 391,600 SF
Design
$10,000,000 CJ est. value
Winston-Salem, NC 27106

Slim Chickens
New Construction - 3,188 SF
Design
$500,000 to $1,000,000 CJ est. value
Kernersville, NC 27284

Kitchen Alteration Mount Tabor High School - Rebid
Renovation
Bidding
$600,000 CJ est. value
Winston Salem, NC 27106

Cook Out
New Construction - 1,881 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Walkertown, NC

Cook Out
New Construction - 1,881 SF
Post-Bid
$490,000 est. value
Winston-Salem, NC 27106

Lewisville Elementary School Building Renovations
Renovation
Results
Lewisville, NC 27023

Circle K
New Construction - 7,850 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Kernersville, NC 27284

Texas Roadhouse
Addition - 91 SF
Construction
$150,000 est. value
Winston-Salem, NC 27103

Starbucks - Peters Creek Parkway / Winston-Salem
New Construction - 2,225 SF
Pending Verification
$700,000 est. value
Winston-Salem, NC 27127

Brunson Elementary School Replacement - Winston-Salem Forsyth County Schools
Demolition, New Construction, Infrastructure
Pending Verification
$34,600,000 CJ est. value
Winston Salem, NC 27101

Loves Travel Stop - Shore Road / Rural Hall
New Construction
Conception
$18,000,000 est. value
Rural Hall, NC 27045

Chick-Fil-A Restaurant #1248
Renovation
Post-Bid
Kernersville, NC

Chick-Fil-A #4772
New Construction - 4,954 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Kernersville, NC 27285

Last Updated 03/28/2023 09:36 AM
Project Title

Cook Elementary School Kitchen

Physical Address View project details and contacts
City, State (County) Winston Salem, NC 27101   (Forsyth County)
Category(s) Commercial, Education
Sub-Category(s) Elementary School, Food/Beverage Service
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $636,000 [brand] Estimate
Plans Available from Plan Holders - 02/06/23
Owner View project details and contacts
Architect View project details and contacts
Description

Bidders shall use complete sets of Bidding Documents in preparing bids; neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. All contractors are hereby notified that they must have proper license as required under the state laws governing their respective trades. The bidder shall identify, on the bid proposal, minority business participation it will use on the project. Forms are included within the Proposal Form in the bid documents. Failure to complete these forms is grounds for rejection of the bid. (GS143-128.2c- Effective 1/1/2002.) Each proposal shall be accompanied by a cash deposit or a certified check drawn on a bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price. Payment will be made based on NC General Statute 143.134.1 or ninety percent (90%) of monthly estimates and final payment made upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 40 days. The owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Institutional Furniture, Classroom Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents