Similar Projects
I Ellis Johnson School Project
New Construction, Renovation
Conception
Laurinburg, NC 28352

Brevard Academy New Arts Building
New Construction
Conception
$1,000,000 est. value
Pisgah Forest, NC 28768

ArtsCenter
Renovation, Infrastructure - 17,864 SF
Design
$3,000,000 CJ est. value
Carrboro, NC 27510

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

RFQ Construction Management at Risk - Conservatory for Biodiversity and Education Research
New Construction, Infrastructure - 50,000 SF
Bidding
$54,000,000 CJ est. value
Boone, NC 28607

Central Elementary School - HVAC, Electrical and Fire Alarm Upgrades Phase 2
Renovation
Bidding
$3,968,300 CJ est. value
Hillsborough, NC 27278

Design-Build Services Elementary School Youngsville Academy Charter School
New Construction
Post-Bid
Youngsville, NC 27596

Construction of the Belmont Elementary School
New Construction
Post-Bid
Roanoke Rapids, NC 27870

DPS - Rockingham Youth Development Center- Grading and Utilities
Results
Rockingham, NC 28379

Additions and Renovations to Lakeshore Elementary School
Renovation, Addition - 103,424 SF
Results
Mooresville, NC 28117

Cameron Park Elementary School Renovation (Phase 1)
Renovation
Construction
Hillsborough, NC 27278

Northwest Elementary
New Construction - 121,578 SF
Construction
Less than $29,000,000 est. value
Fuquay-Varina, NC 27526

Cannon 35
New Construction, Infrastructure
Pending Verification
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Construction of New Emergency Medical Services (EMS) Base Station
New Construction, Infrastructure
Pending Verification
$125,000 CJ est. value
Brevard, NC 28712

Carthage Elementary School Replacement
New Construction
Conception
$54,000,000 est. value
Carthage, NC

Last Updated 10/07/2022 01:11 PM
Project Title

Scotts Creek Elementary Slope Stabilization - Jackson County Public Schools

Physical Address View project details and contacts
City, State (County) Sylva, NC 28779   (Jackson County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $113,850 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 7, 2022, an architect has been selected. This project is in the design phase and pending funding. A firm timeline for construction has not been determined. A detailed scope of work has not been disclosed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents