Similar Projects
Page Hall Renovation
Renovation, Alteration - 30,000 SF
Design
Raleigh, NC 27695

Manns Harbor Shipyard Main Building HVAC
Post-Bid
Manns Harbor, NC 27953

Jet Bridges Pc Air And Gpus
Post-Bid
Greensboro, NC

Administration Building AHU Replacement
Results
$276,915 est. value
Durham, NC 27701

DPS - Morrison Aggrey Dorm Heating System Replacement
Results
Raleigh, NC 27699

Unc School Of The Arts Residence Hall HVAC Phase 2
Construction
Winston-Salem, NC

Central Elementary School - HVAC, Electrical and Fire Alarm Upgrades
Post-Bid
Hillsborough, NC 27278

Construction of HVAC and Electrical Renovations for Rock Quarry Road Auxiliary Services
Results
Raleigh, NC 27610

Lewisville Elementary School HVAC Unit Replacement
Post-Bid
Lewisville, NC 27023

Design-Build Services for Mechanical (HVAC) upgrades to the Durham Bulls Athletic Park
Results
Durham, NC 27701

Chiller Installation and Repair
Term Contract
Post-Bid
Raleigh, NC

Brooks Hall Matsumoto Wing HVAC Renovation
Renovation
Results
Less than $565,616 est. value
Raleigh, NC

HVAC Installation and Repair
Post-Bid
Raleigh, NC

Building 8 HVAC Equipment Replacement
Results
$70,000 to $75,000 est. value
Washington, NC 27889

Lewisville HVAC Replacement
Post-Bid
Lewisville, NC 27023

Last Updated 08/31/2022 09:04 AM
Project Title

Boiler Replacement Project

Physical Address View project details and contacts
City, State (County) Goldsboro, NC 27530   (Wayne County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall furnish all labor, equipment, materials, insurance, supervision, cleanup, permits, and fees and abide by all local, state and federal codes applicable to replace Boiler and related equipment with new equipment that meet or exceed the industry codes and per the requirements below. Size of unit to be of similar type and size to mount on existing structure. If existing structure cannot be utilized, contractor is to supply and install replacement mounting hardware to fit new unit footprint while providing alignment with existing piping/connection. All incidentals necessary to have fully functioning & proper operating systems are to be included. Upon receipt of a written Notice To Proceed (NTP) from the City, the Contractor is to order equipment and provide delivery date to establish job Start Date with Project Coordinator. The time between the NTP and Start Date may not exceed four (4) weeks except by a qualified delivery date from the manufacturer and written acceptance by the City. The duration IFB 2022-017 Boiler Replacement Project Page 19 of 36 of work shall not exceed four (4) weeks from Start Date. Work shall be completed without interruption except for inclement weather during mobilization or equipment delivery, and any extension of time must be requested within 5 business days and approved in writing by the City. Deadline for Written Questions: Monday, September 5, 2022 at 2:00 pm. Email all questions to: twood@goldsboronc.gov All Contractors must be licensed under prevailing State Laws governing their trade. The right is reserved to reject any or all bids, to add or delete work, to waive informalities, and to award contract which, in the opinion of the City, appears to be in its best interest. The right is reserved to hold any or all proposals for a period of sixty (60) days from the opening thereof. The City of Goldsboro has an affirmative policy of fostering, promoting and conducting business with women and minority owned enterprises. Women and minority contractors are encouraged to participate in the pre-qualification process.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents