Similar Projects
RFQ - Center Street Sidewalks Construction Services
Term Contract
Conception
Rock Island, WA 98850

RFQ - Center Street Sidewalks Construction Services
Term Contract
Conception
Rock Island, WA 98850

Chief Joseph Dam Debris Boom
Infrastructure
Design
$5,000,000 CJ est. value
Bridgeport, WA 98813

New Fire Station - Beebe Fire Station
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Orondo, WA 98843

Chief Joseph Dam Spillway Monolith Sealing, Bridgeport, Washington
Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Bridgeport, WA 98813

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Okanogan County Ellisforde Landfill Wells and Gas Probe Decommissioning
Infrastructure
Sub-Bidding
$45,000 CJ est. value
Oroville, WA 98844

Okanogan County Ellisforde Landfill Wells and Gas Probe Decommissioning
Infrastructure
Sub-Bidding
$45,000 CJ est. value
Oroville, WA 98844

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Dollar General #24148 / Bridgeport - Revised
New Construction, Infrastructure - 12,480 SF
Post-Bid
$1,500,000 CJ est. value
Bridgeport, WA 98813

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Northern Fruit Campus
New Construction, Infrastructure
Pending Verification
$201,300,000 CJ est. value
East Wenatchee, WA 98802

Northern Fruit Campus
New Construction, Infrastructure
Pending Verification
$201,300,000 CJ est. value
East Wenatchee, WA 98802

Elmwood and Peachtree Place Rehabilitations Project
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Okanogan, WA 98840

Last Updated 08/11/2022 02:31 PM
Project Title

Bridgeport Transfer Station Valley Gutter

Physical Address View project details and contacts
City, State (County) Bridgeport, WA 98813   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bridgeport Transfer Station Valley Gutter No facsimiles or electronic proposals will be accepted. All bid proposals shall be accompanied by a bid proposal deposit by certified check, cashier's check or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish a satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to Okanogan County. The County of Okanogan in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex, in consideration for an award. The Board of Commissioners of Okanogan County, reserves the right to reject any and all bids and to waive informalities in the bidding. The award of this contract, if made, will be to the lowest responsible bidder. This Contract provides for the removal of a 100' long 12" diameter slotted drain and catch basin from foundation. Install new 100' long valley gutter with catch basin, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. Contractor shall sawcut and remove existing 150 LF of 6" concrete and 50 LF of 3", asphalt on either side of existing slotted drain and catch basin no. 1. Contractor shall ,excavate to the depth as shown in the plans. Contractor shall remove and install , new catch basin no. 1 and approximately 6 LF of 8" PVC drain pipe. Contractor shall ,install new catch basin no 1 and connect 8" PVC pipe to existing drain system. See, Std. Spec 7-05 Manholes, Inlets, Catch Basins, and Drywells, Contractor shall remove catch basin no.2, backfill and compact with approved ,material. The new valley gutter shall be 100' long, and be built in accordance with the plans The Contractor shall make all measurements of the foundation necessary to ensure proper fit and function of new valley gutter and catch basin

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents