Similar Projects
US 219-WV 72 I/C (AC Payback) NSFLTP Grant
Infrastructure
Design
$12,000,000 CJ est. value
Elkins, WV 26241

US 219-WV 72 I/C (AC Payback) NSFLTP Grant
Infrastructure
Design
$12,000,000 CJ est. value
Elkins, WV 26241

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Phase III - Sanitary Sewer System Extension
Infrastructure
Bidding
$2,000,000 CJ est. value
Norton, WV 26285

Post-Harvest Site Preparation Services
Alteration
Post-Bid
Durbin, WV 26264

Tygart Valley River Riverfront Development - City of Elkins
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Elkins, WV 26241

Webster Co Line - Middlebourne
Infrastructure
Results
WV

Deep Injection Roadway Settlement Stabilization
Infrastructure
Results

Beverly - Kings Run
Infrastructure
Design
$515,000 CJ est. value
Mill Creek, WV 26280

5 River Street B-50 Lot 715 Part 1
Term Contract, Demolition, Infrastructure
Post-Bid
$200,000 CJ est. value
Elkins, WV 26241

Harman Rd
Infrastructure
Results
WV

Pocahontas Co - Mingo
Infrastructure
Design
$425,000 CJ est. value
Mill Creek, WV 26280

Beckys CRK-Huttonsville
Infrastructure
Results
WV

Elkins - Beverly Pike
Infrastructure
Design
$300,000 est. value
Valley Bend, WV 26293

WV 72 I/C - Parsons
Infrastructure
Results
$60,000,000 est. value
WV

Last Updated 03/09/2023 10:03 AM
Project Title

Logan Run - Valley Head

Physical Address View project details and contacts
City, State (County) Valley Bend, WV 26278   (Randolph County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $441,044 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Asphalt paving Logan Run - Valley Head State Project S342-219-5.74 00 Federal Project NHPP-0219(392)D Bidder Must Provide Written Assurance of Meeting Goal on Form in Proposal. Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Viriginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of the total bid, whichever is greater The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. WVDOT - Call Order : 020 Asphalt paving Completion- June 30, 2023 MBE (2.1%), WBE (6.9%), DBE (5%)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents