Project Title | Bayshore Bikeway: Barrio Logan Project |
Physical Address | View project details and contacts |
City, State (County) | San Diego, CA (San Diego County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $15,011,378 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists in general of approximately 2.3 miles of Class I bikeway along Harbor Drive between Park Boulevard and 32nd Street within the City of San Diego and Port of San Diego Tidelands. The bikeway will extend along the western side of Harbor Drive between Park Boulevard and Cesar Chavez Parkway. The bikeway will cross to the eastern side of Harbor Drive at Cesar Chavez Parkway, where it will extend to 32nd Street. Roadway improvements are required to accommodate the Class I bikeway. Features include raised concrete medians and buffers, concrete curb & gutter, asphalt concrete dike, curb extensions, concrete barrier railing, chain link fencing, street lighting, traffic signal modifications and other traffic safety measures linked to signage and striping. At the intersection of Harbor Drive and 32nd Street, the existing steel span pedestrian bridges will be removed, and the existing concrete abutments and stairs will be demolished. On 32nd Street, between Harbor Drive and Norman Scott Road, improvements include new sidewalk and medians, traffic signal improvements, and railroad signaling improvements for the MTS Trolley. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |