Similar Projects
McKelvey Road Resurfacing and Sidewalks - Phase 1
Infrastructure
Bidding
MO

Conway Park Path Improvements Project
Infrastructure
Bidding
Creve Coeur, MO

Spanish Pond ADA Improvements
New Construction
Post-Bid
MO 63138

Installation of a Walking Track
Infrastructure
Post-Bid
Overland, MO

Parks Parking Lots and Trail Sealing
Results
Maryland Heights, MO

Longview Farm Pedestrian Guard Rail Replacement
Infrastructure
Results
Saint Louis, MO 63141

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Parking Lot Rehabilitation
Infrastructure
Post-Bid
Chesterfield, MO 63005

2021 Downtown Parking Lots and Alley Asphaltic Concrete Overlay
Infrastructure
Results
Kirkwood, MO

Saint Vincent Greenway: Trojan Park to Robert L. Powell Place
New Construction, Infrastructure
Post-Bid
Saint Louis, MO 63133

Seton Hall Exterior Ramp
Infrastructure
Results
Saint Louis, MO

Glengrove Drive and Glenridge Drive Sidewalk Project
Infrastructure
Post-Bid
Maryland Heights, MO 63043

Selective Slab Replacement
Infrastructure
Results
Green Park, MO 63123

Repavement of the Streetscape and Flag Pole Installation at the Justice Center
Infrastructure, Alteration
Post-Bid
Clayton, MO 63105

Rosalie Avenue Pedestrian Improvements
Infrastructure
Results
Brentwood, MO

Last Updated 11/08/2021 06:08 PM
Project Title

2022 and 2023 Citywide Sidewalk

Physical Address View project details and contacts
City, State (County) Saint Louis, MO   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $969,502
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Minority Business Enterprise (MBE) goal and the Women Owned Business enterprises (WBE) goal for this Letting is " Maximum Utilization of MBE and WBE". maximum Utilization is deemed to have been met when any subcontracting or supplies equal a minimun of 24% MBe goal distributed as follows 21 % African American , 25 Hispanic American, 5% Asian American, and 5% Native American plus 11%WBE, M/WBE Participation level is to be based on the base bid.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents