Similar Projects
Repair Northbound S.C. Phillips Parkway, CCAFS, FL
Design
Cape Canaveral, FL 329252206

Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Resurface Roads
Renovation
Post-Bid
Brooksville, FL 34613

Design Build Push Button
Results

Design Build Push Button
Results

Reedy Creek Improvement District - World Drive Extension Construction Project
New Construction
Construction
Lake Buena Vista, Orlando, FL 32830

LPGA Boulevard Roadway Improvements
Construction
$400,000 est. value
Daytona Beach, FL 32114

Construction Manager at Risk Town-Wide Overhead Utility Undergrounding Phase 2 & 3 - South
Post-Bid
West Palm Beach, FL

Annual Asphalt Overlay
Term Contract
Results
Less than $1,000,000 est. value
Jupiter, FL

Improvements to Estero Boulevard - Segments 3 & 4 Project
Post-Bid
Fort Myers, FL

Windsor Avenue Roadway and Utility Improvements - Construction Phase Services
Results
West Palm Beach, FL

I-95 Express Lanes Phase 3B-2
Results
FL

Biscayne Trail Segment C - Hybrid/Mountain Bike Trail and Spurs Rest Area
Results
Less than $422,497 est. value
FL

Osprey Ridge & Eco Road Extension Project
Results
Less than $4,427,556 est. value
Jacksonville, FL

Resurfacing Group 17-18
Results
Less than $4,950,000 est. value
FL

Last Updated 01/09/2019 01:37 PM
Project Title

City of Chipley - 5th Street Phase II

Physical Address View project details and contacts
City, State (County) Chipley, FL   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $359,140
Plans Available from Engineer - 07/06/18
Owner View project details and contacts
Architect View project details and contacts
Description This project consists of milling and resurfacing approximately 1,144 LF of 5th Street and full depth reclamation on 1,585 LF of 5th Street from South Blvd. to Hwy 90 and drainage improvements at the intersection of 5,h Street and Forrest Ave. in Chipley, Florida. Resurfacing will consist of structural and surface courses along with minor cut and patch locations. Full depth reclamation will consist of structural and surface courses. Signing and pavement markings will be included in this project consisting of thermoplastic striping on the final lift of asphalt. Drainage improvements will consist of installation of two new inlets and pipe. Alternate bid will consist of milling and resurfacing instead of full depth reclamation.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents