Similar Projects
Repaving Open Cuts In Driveways and Sidewalks Resulting from the Repair to the Sewerage and Water Board of New Orleans Underground Utilities
Infrastructure
Bidding
LA

Desoto Parish Drainage Improvements and Road Repairs
Infrastructure
Bidding
$1,000,000 to $1,200,000 est. value
Mansfield, LA

Port Allen Phase III Bulk Scale and Annex
Infrastructure
Post-Bid
$5,500,000 to $7,500,000 est. value
Port Allen, LA

Winfield Road Improvements
Infrastructure
Post-Bid
Bossier City, LA

Lafourche - Terrebonne Scenic Overlook
Infrastructure
Results
$100,000 to $250,000 est. value
LA

LA 128: LA 573 - US 65
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
LA

2022 Overlay Program
Infrastructure
Bidding
Deridder, LA

Cold Mix (Colay) and Hot Mix
Infrastructure
Post-Bid
Farmerville, LA

LA 4: LA 128 - 1.6 MI. E. LA 888
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
LA

Fuqua Street and Gracie Street Area ADA Transition Project
Infrastructure
Bidding
LA

2021 Street Improvements
Infrastructure
Post-Bid
Winnsboro, LA

La 641 and La 3125: Int. Improvements
Infrastructure
Results
$250,000 to $500,000 est. value
LA

Bayou De Zaire - Lalanne Rd
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
LA

Proposed Street Improvements Drive 4263 PW 910 Paved Roads
Infrastructure
Post-Bid
Benton, LA

US 90b:La 428 Overpass (Level Appr Slab)
Infrastructure
Results
$100,000 to $250,000 est. value
LA

Reported 12/18/2021 12:00 AM
Project Title

2021 City-Wide Street Improvements (Contract B)

Physical Address View project details and contacts
City, State (County) LA   (Acadia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of approximately 9,400 tons of asphalt street patching, approximately 500 tons of asphalt street leveling, approximately 42 miles of asphalt overlay (1.5” and 2” thick), approximately 110,000 square yards of asphalt surface milling, reconstruction utilizing in-place soil cement stabilization of approximately 1 mile of asphalt roadway, approximately 100 square yards of concrete street patching, approximately 1,200 feet of crack routing, cleaning, and sealing of asphalt surface roadways, and other incidentals including (but not limited to) adjusting manholes and valve boxes, restoration of thermoplastic pavement markings and legends and symbols, reconstruction of concrete driveways and sidewalks, removal and replacement of storm drain pipes and storm drain structures, and removal and replacement of concrete curbs and gutters in various areas.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents