Last Updated | 02/15/2023 11:38 PM |
Project Title | Yuma Drive Saddleback Addition Street Repair and Stormwater Improvements |
Physical Address | View project details and contacts |
City, State (County) | Broken Arrow, OK 74011 (Tulsa County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $87,516 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Est. Completion Date: Sept. 23, 2022 Pre-Bid Meeting Info: There will be not be a mandatory pre-bid meeting for this project. This project includes pavement repair and stormwater improvements on Yuma Dr. north of the intersection with E. Baton Rouge St. in the Saddleback Addition. The stormwater improvements include installation of 140 feet of perforated under drain and 103 feet of non-perforated under drain installed beneath approximately 280 square yards of full depth asphalt pavement repairs. The project also includes construction of approximately; 30 feet of 5' wide sidewalk; 50 feet of curb and gutter; 72 square yards of residential concrete driveway; ancillary pavement cold milling. Sworn statement of the Bidder's assets and liabilities, technical qualifications and performance in the form of the latest annual report and financial statement are not required to be submitted with the Bidder's Proposal, but City of Broken Arrow may require such statements prior to award of the construction contract. Both the Statement of Qualifications & Experience and the Statement of Key Personnel Qualifications & Experience, using the forms found in Section II Proposal Documents, must be submitted with the bid and include, as a minimum, the information required herein. Failure to submit the information required in these documents may result in the City of Broken Arrow considering the Bid non-responsive and result in rejection of the Bid by the City of Broken Arrow. Bidders may be required to provide supplemental information if requested by the City of Broken Arrow to clarify, enhance or supplement the information provided in the Statement of Qualifications & Experience and/or the Statement of Key Personnel Qualifications & Experience. The apparent successful Bidder shall, within two (2) days after Bid opening, submit to City of Broken Arrow a list of the Subcontractors, Suppliers, individuals or entities proposed for the following portions of the Work: none. Such list shall be accompanied by a Statement of Qualifications & Experience as well as a Statement of Key Personnel Qualifications & Experience, using the forms found in Section II Proposal Documents, with pertinent information regarding similar projects and other evidence of qualification and experience for each such Subcontractor, Supplier, or other individual or entity. If City of Broken Arrow or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, City of Broken Arrow may, before the Notice of Award is given, request apparent successful Bidder to submit an acceptable substitute, within one (1) day of notification. If apparent Successful Bidder declines to make any such substitution, City of Broken Arrow may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. In such event, the next lowest Bidder shall, within two (2) days after requested by the City of Broken Arrow, submit to City of Broken Arrow the above required list of the Subcontractors, Suppliers, and other individuals or entities. In evaluating whether a Bidder is responsible, City of Broken Arrow will consider the qualifications and experience of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided above. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to the City of Broken Arrow. The successful Bidder must, within five (5) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by City of Broken Arrow in the amounts equal to the Contract price. Contract time for the project shall be Forty Five (45) calendar days. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |