Similar Projects
Howard Street Phase 2, Cleveland Park Area Waterline Rehabilitation Project
Post-Bid
Spartanburg, SC 29301

Clem's Brand/Sugar Creek Interceptor Phase III
Post-Bid
SC

East Main Street at South Anderson Road Waterline
Results
Rock Hill, SC

Replacement of All Existing Waterlines and Meters
Results
Less than $2,859,092 est. value
Bethune, SC 29009

Water Sewer System Improvements - Connelly Road - 6" Main
Post-Bid
Pickens, SC

Ehrenclou Drive Water and Sewer Line Extensions
Results
Less than $199,038 est. value
Camden, SC 29020

Joanna Waterline Improvements
Post-Bid
SC

Highway 327 and Highway 57 Water Line Relocation
Results
Florence, SC

Highway 72 Distribution Main
Post-Bid
SC

Calhoun Avenue 12-Inch Water Main Replacement
Results
Less than $486,218 est. value
Greenwood, SC

Creekview Drinking Water Distribution Rehabilitation Project
Post-Bid
$150,000 to $200,000 est. value
Clemson, SC

Kitson Street/Lowell Avenue 6-Inch Water Main Replacement
Results
Less than $505,400 est. value
Greenwood, SC 29648

Pump Station 151 Upgrade
Renovation
Post-Bid
Summerville, SC 29486

Energy Savings Performance Services
Term Contract
Results
Columbia, Eastover, Hopkins, SC 29209

Sullivan`S Island Wastewater Lift Station Conversions
Post-Bid
Charleston, SC 29482

Last Updated 10/30/2020 12:53 PM
Project Title

Pump Station #79 Force Main Upgrade

Physical Address View project details and contacts
City, State (County) Saint George, SC   (Dorchester County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction activity at this site will consist of installing approximately 4,100 lf of 10" fusible PVC force main via horizontal directional drill. The proposed 10" force main will connect from an existing and rehabilitated pump station (#79) and discharge to an adjacent existing pump station (#11). The site is located in the Windsor Hill Plantation neighborhood.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents