Similar Projects
Last Updated | 12/20/2019 12:04 PM |
Project Title | General Sidewalks Improvements |
Physical Address | View project details and contacts |
City, State (County) | Greensboro, NC (Guilford County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of approximately 675 square yards (SY) of 4" of concrete sidewalk, 75 square yards (SY) of 6" concrete driveways, and 13 concrete curb ramps. Additionally, approximately 630 SY of existing 4" concrete sidewalk will be removed and replaced, 25 SY of existing 6" concrete driveways will be removed and replaced, and 3 existing concrete curb ramps will be removed and replaced. Also, asphalt paving will be required on O`Connor Street. The work is to take place along the following streets: 1) Mayflower Drive and Cobb Street 2) Holders Road 3) Van Wert Street 4) O`Connor Street |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |