Similar Projects
Construction Services for Jetty and Wing Wall Repairs In Kennebunk and Kennebunkport, Maine
Design
$1,000,000 to $5,000,000 est. value
Kennebunk, Kennebunkport, ME

2021 Grants for Stream Crossing Infrastructure Improvements
Infrastructure
Bidding
Augusta, ME

Outlet Road Ditch Cleaning/Repair
Infrastructure
Bidding
Farmingdale, ME

Ditching and Culvert Work
Post-Bid
Princeton, ME

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Post-Bid
$500,000,000 est. value
Kittery, ME

Senott Road Culvert Replacement
Results
Whitefield, ME

Adams Street Ditching and Culvert Replacement
Results
Farmingdale, ME

Culvert Replacement and Stream Restoration
Infrastructure
Bidding
Cornville, ME 04976

2019 Grants for Stream Crossing Public Infrastructure Improvements
Post-Bid
Less than $125,000 est. value
Augusta, ME

Loon Lake Road Rangeley
Results
Rangeley, ME

Corrugated Exterior/Smooth Interior Hdpe Culvert Pipe
Infrastructure
Post-Bid
Turner, ME

Culvert Slipline
Results
Skowhegan, ME 04976

Cleanup and Decommissioning of the Former Mason Station Ash Ponds
Infrastructure
Post-Bid
$320,000 est. value
Wiscasset, ME 04578

Supply and Delivery of a Precast Concrete Box Culvert
Results
Gorham, ME 04038

Spaulding Lake Road Culvert Replacement
Infrastructure
Post-Bid
Oakfield, ME 04763

Last Updated 09/21/2021 09:39 AM
Project Title

Elm Street Culvert Replacement

Physical Address View project details and contacts
City, State (County) Topsham, ME 04086   (Sagadahoc County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of removal of an existing granite block culvert and retaining wall and replacement with approximately 80 linear feet of 48-inch diameter storm drain in kind. The project also consists of rebuilding the existing retaining wall on the downstream end of the culvert along with replacement of existing catch basins and storm drains.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents