Similar Projects
Farmstone Meadows Residential Subdivision
New Construction, Infrastructure
Conception
$38,300,000 CJ est. value
Willow Springs, NC 27520

Farmstone Meadows Residential Subdivision
New Construction, Infrastructure
Conception
$38,300,000 CJ est. value
Willow Springs, NC 27520

Whitley Townes
New Construction, Infrastructure
Design
$32,200,000 CJ est. value
Smithfield, NC 27577

Whitley Townes
New Construction, Infrastructure
Design
$32,200,000 CJ est. value
Smithfield, NC 27577

RFP D/B - Fire Station 1 and 2 Fire Sprinkler Installation and Building Improvements
Addition, Demolition, Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Clayton, NC 27520

Sams Branch Water Reclamation Facility
New Construction, Infrastructure
Bidding
$150,000,000 CJ est. value
Clayton, NC 27520

Johnson Regional Airport Hangar and Office Space
New Construction
Post-Bid
Smithfield, NC

385 West Transmission Improvements
Post-Bid
$600,000 est. value
Clayton, Smithfield, NC 27520

2021 Street Resurfacing Project
Results
$746,378 est. value
Garner, NC

FY 2021 Road Rehabilitation Project
Results
$1,013,373 est. value
Clayton, NC

Rand Village - Sitework
New Construction
Construction
Garner, NC

Blue Line Aviation
New Construction
Pending Verification
Smithfield, NC

Wilder's Market
Demolition, New Construction, Infrastructure - 4,500 SF
Pending Verification
$4,000,000 CJ est. value
Clayton, NC 27520

Grading, Drainage and Paving
Infrastructure
Bidding
$2,000,000 CJ est. value
Smithfield, NC 27577

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Last Updated 09/27/2022 09:18 AM
Project Title

Hangar Site Development and Parking Lot Expansion - Rebid

Physical Address View project details and contacts
City, State (County) Smithfield, NC 27577   (Johnston County)
Category(s) Heavy and Highway, Sewer and Water, Transportation
Sub-Category(s) Aircraft Hangar, Airline/Passenger Terminal, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $4,445,852 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The deadline to submit questions regarding the project was changed to Friday April 22, 2022 at 5:00 PM EST. The project will include removal of existing hangar buildings, demolition of existing taxilanes and utilities, construction of new vehicle parking lot with curb and gutter and area lighting, earthwork, erosion control measures, sidewalk construction, asphalt airfield ramp expansion, storm drain construction, security fence installation and relocation, new utility installation, and electrical improvements (electrical improvements are under a separate cover). The project will be split into four (4) different Schedules: Schedule 1 - Drainage Improvements o Schedule 2 - Parking Lot o Schedule 3 - Corporate Hangar Site Preparation o Schedule 4 - Electrical Improvements [by others] All questions concerning the Plan and Specifications during the bidding period must be emailed to the attention of Rich Bauer, P.E., Project Manager and Zachary Savage, P.E., Project Engineer Contractors desiring to perform work on NCDOT projects shall pre-qualify with the Department. Upon pre-qualification, Contractors will be placed on the Department's Prequalified Bidders List and/or the Approved Subcontractors List, depending on the application submitted.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents