Similar Projects
South Clark Street Bridge Over Blackhawk Creek - FP004 - City of Davenport
Infrastructure
Conception
$770,000 CJ est. value
Davenport, IA 52802

South Clark Street Bridge Over Blackhawk Creek - FP004 - City of Davenport
Infrastructure
Conception
$770,000 CJ est. value
Davenport, IA 52802

Alley Reconstruction From 301 Kirkwood Boulevard to 330 E. 15th Street
Infrastructure
Bidding
$100,000 CJ est. value
Davenport, IA 52801

Alley Reconstruction From 301 Kirkwood Boulevard to 330 E. 15th Street
Infrastructure
Bidding
$100,000 CJ est. value
Davenport, IA 52801

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

Main Street Landing - Destination Play Area and Event Lawn
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Davenport, IA 52803

Wisconsin & 35th Street Improvements – HMA Surfacing And Trail
Infrastructure
Results
Le Claire, IA

CDBG Group 2 - Reconstruction East 7th Street (Iowa to LeClaire) and LeClaire Street (6th-8th)
Infrastructure
Results
Davenport, IA 52803

New Juvenile Detention Center - Scott County
Demolition, New Construction, Infrastructure
Pending Verification
$21,750,000 CJ est. value
Davenport, IA 52803

Middle Road Pedestrian Bridge - City of Bettendorf
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bettendorf, IA 52722

Eastern Avenue Bridge at Goose Creek - FP005 - City of Davenport
Infrastructure
Conception
$440,000 CJ est. value
Davenport, IA 52807

Duck Creek Bank Stabilization
Infrastructure
Bidding
$22,000 CJ est. value
Davenport, IA 52803

Fairmount Community Center
New Construction, Infrastructure - 30,000 SF
Post-Bid
$2,200,000 CJ est. value
Davenport, IA 52804

31st and 32nd Street Speed Hump
Infrastructure
Results
Davenport, IA

Townplace Suites by Marriott
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Davenport, IA 52801

Last Updated 01/18/2023 10:34 PM
Project Title

PCC Patching

Physical Address View project details and contacts
City, State (County) Bettendorf, IA 52722   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $914,440 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Id : 220517 R1 Counties : Scott Working Days : 40 Nhsn-067-1(161)--2r-82 Route: U.s. 67 In Davenport, S of Mound St Estimated Value : $500,000 - $750,000 Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to Execute a Contract and File an Acceptable Performance Bond and Certificate of Insurance Within 30 Days of the Approval Date for Awarding the Contract Will Be Just and Sufficient Cause for the Denial of the Award and Forfeiture of the Proposal Guaranty. On Federal-aid Projects, Where Disadvantaged Business Enterprise (Dbe) Goals Have Been Established, the Bidder Is Required to Complete and Submit Form 102115 With the Bid Documents. On All Projects Without Dbe Goals, the Contractor Must Show That Affirmative Action Has Been Made to Seek Out and Consider Dbes as Potential Subcontractors. Minimum Wage Rates for All Federal-aid Projects Have Been Predetermined by the U.s. Secretary of Labor and Are Set Forth in the Specifications. However, This Does Not Apply to Projects Off the Federal-aid Highway System. All Federal-aid Projects Are Subject to the Contract Work Hours Standards Act, as Amended (Title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and Implementing Regulations. The Iowa Dot Reserves the Right to Waive Technicalities and Reject Any or All Bids. IADOT - Bid Order Number: 201 - PCC Patching *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents