Similar Projects
Henderson Water Utility System Operation Center Site Fence
Infrastructure
Sub-Bidding
$40,000 CJ est. value
Henderson, KY 42420

Perimeter Fencing Improvement
Alteration
Post-Bid
Russellville, KY 42276

Fence Installation
Alteration
Post-Bid
Morganfield, KY 42437

Baseball Field Backstop Safety System
Results
Union, KY 41091

Stainless Steel Slide Gates at Town Branch WWTP
Results
Lexington, KY 40504

Fence Repair and Installation
Alteration
Post-Bid
Louisville, KY

Perimeter Fence Improvements
Alteration
Results
$169,000 est. value
Pewee Valley, KY

Storm Related Right-Of-Way Repairs
Infrastructure
Post-Bid
Bowling Green, KY 42101

RWRA Facility Fencing Upgrades
Alteration
Results
Owensboro, KY

Oliverio Park & 17th Street Ballfields Fencing Replacement
Alteration
Post-Bid
Ashland, KY

Veterans Park Dog Park Fencing
Alteration
Results
Lexington, KY 40515

Baseball and Softball Field Services
Renovation, Alteration
Post-Bid
Inez, KY

New Security Fencing at the Louisville Metro Police Department Vehicle Storage Facility
Alteration
Results
Louisville, KY 40206

Synthetic Turf Fields
Infrastructure
Post-Bid
Barbourville, Corbin, KY 40701

Chain Link Fencing
Infrastructure
Results
Lexington, KY 40502

Last Updated 09/30/2022 09:11 AM
Project Title

Steel Fencing and Installation

Physical Address View project details and contacts
City, State (County) Fort Thomas, KY 41075   (Campbell County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: 700 Alexandria Pike, Fort Thomas, Kentucky 41075 Online Bidding: Available Fee for bidding online is $15.00 The Work covered in this section includes furnishing of all labor, materials, and equipment for the installation of six gates and a new fence approximately 2400 linear feet around the Northern Kentucky Water District's ("NKWD") Fort Thomas Treatment Plant ("FTTP") North Reservoir. Contractor shall be responsible for removal and proper storage on the premises of existing fencing materials and preparing surface to receive fencing installation. Work shall be substantially complete within 90 days of the date the Contract Times commence to run. The date the Contract Times commence to run will be established in a Notice to Proceed to be issued in writing by District to the Contractor. The Work will be completed and ready for final payment within 100 days of the date the Contract Times commence to run. The Work is expected to begin after the completion of the District's Fort Thomas Treatment Plant North Reservoir Area Asphalt Restoration project. The anticipated timeframe for the Work's project start date is the first quarter of 2023, but no guarantees are made as to the project schedule.

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents