Similar Projects
7 North High Street Redevelopment
Build-out, Infrastructure - 8,316 SF
Conception
$300,000 CJ est. value
Belleville, IL 62220

Renner Funeral Homes Crematory
New Construction, Infrastructure - 4,950 SF
Conception
$1,000,000 CJ est. value
Belleville, IL 62220

Central Park - Lot 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
O Fallon, IL 62269

Hampton Manor of St. Clair County
New Construction, Infrastructure - 66,481 SF
Design
$18,000,000 CJ est. value
O Fallon, IL 62269

Christian Brothers Automotive / O'Fallon
New Construction, Infrastructure - 4,959 SF
Bidding
$1,200,000 CJ est. value
O Fallon, IL 62269

St. Clair County MetroLink Extension Shiloh-Scott to MidAmerica St. Louis Airport Systems
Infrastructure
Bidding
$1,873,000 CJ est. value
Scott Air Force Base, IL 62225

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

North Jefferson Street (Il 4) Shared Use Path
Infrastructure
Post-Bid
$324,013 est. value
Mascoutah, IL 62258

2021 Water Main Replacement Program
Infrastructure
Results
O Fallon, IL 62269

Wastewater Treatment Facility Improvements Phase II
Renovation, Infrastructure
Results
Belleville, IL

Freddy's Frozen Custard & Steakburgers - Belleville Crossing / Belleville
New Construction, Infrastructure - 3,238 SF
Construction
$850,000 CJ est. value
Belleville, IL 62220

Mid America Commerce Center
New Construction, Infrastructure
Construction
$80,000,000 CJ est. value
Belleville, IL 62269

Brandywine Garden Villas
New Construction, Infrastructure - 62,622 SF
Pending Verification
$75,000,000 CJ est. value
O Fallon, IL 62269

West Presidential Streets Phase 2 - City Of O'Fallon
Infrastructure
Pending Verification
$1,500,000 CJ est. value
O Fallon, IL 62269

$PRESS - Wells Fargo Advisors Campus Redevelopment - Midas Construction
Demolition, New Construction, Infrastructure
Design
$120,000,000 CJ est. value
Alorton, IL 62207

Last Updated 04/28/2023 10:44 AM
Project Title

Van Buren Street 2021 IGD Sewer Replacement

Physical Address View project details and contacts
City, State (County) New Athens, IL 62264   (Saint Clair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $49,240 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvement consists of the replacement of approximately 365 feet of 8 inch sanitary sewer line. COMPLETION OF IGD FORMS: Each bidder shall complete the respective forms provided by the St. Clair County Intergovernmental Grants Department (IGD) and submit with their bid proposal. Bidder is subject to non-acceptance of bid proposal should forms not be completed and submitted with proposal. MBE PARTICIPATION: Include Minority Business Enterprise (MBE) participation of fifteen percent (15%) of the awarded Community Development Block Grant (CDBG) funds to the project. Participation of a MBE is required by the US Department of Housing and Urban Development under 24 CFR, Part 85.36. Bidders will complete their MBE Participation Contractor's Agreement and submit a completed MBE Contractor Certification form reflecting the participating MBE as a subcontractor (unless a supplier) as a part of the bid proposal. AFFIRMATIVE ACTION - SECTION 3: The requirements of Section 3 of the Housing and Urban Development Act of 1968 (12 USC 1701u) are included in the IGD documentation requirements and shall be completed and submitted as a part of the bid proposal. All proposals must be accompanied by a bid bond on the form contained in the proposal, bank cashier's check, bank draft, or certified check, payable to the Village of New Athens, for not less than five percent (5%) of the amount of the bid. The Village of New Athens reserves the right to accept or reject any or all bids and to waive any informality in any bid should it consider same to be in its best interest. Bids may not be withdrawn for a period of ninety (90) days after the bid opening. All work will be constructed in accordance with the "Standard Specifications for Water and Sewer Main Construction in Illinois", latest edition.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents