Similar Projects
Miami Freedom Park & Soccer Village
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

Miami Freedom Park & Soccer Village
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

One Island Park
New Construction - 123,087 SF
Design
$10,000,000 CJ est. value
Miami Beach, FL

One Island Park
New Construction - 123,087 SF
Design
$10,000,000 CJ est. value
Miami Beach, FL

The Kavista
New Construction - 201,283 SF
Bidding
$10,000,000 CJ est. value
Miami, FL 33138

Mixed-Use Developments Incorporating Class A Office Space On City-Owned Parking Lots P25, P26, P27 and Parking Garage G5
New Construction
Bidding
Miami Beach, FL

Jackson Memorial Hospital - East Parking Garage (Red Parking Garage) Repairs
Renovation
Sub-Bidding
$3,000,000 est. value
Miami, FL 33136

Design-Build Services for Additional Elevators at Dadeland North Metrorail Station Parking Garage Project
Addition
Post-Bid
FL

HUD Office Renovation, Brickell Plaza Fed Bldg - Miami
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Hallandale Beach, Miami, FL 33009

Construct Outdoor Fitness Facility
New Construction
Results
$250,000 to $500,000 est. value
Homestead, FL 33039

City Hall Parking Garage-General Maintenance and Repairs
Results
Less than $125,000 est. value
Hialeah, FL 33010

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

The Watermark at Merrick Park
New Construction - 256,917 SF
Construction
$21,500,000 est. value
Coral Gables, FL 33146

Varadero
New Construction - 2,456,798 SF
Conception
$10,000,000 CJ est. value
Sunny Isles, FL

Indian Creek Apartments
New Construction, Renovation, Addition
Design
Miami Beach, FL

Reported 09/10/2021 12:40 PM
Project Title

545 Wyn

Physical Address View project details and contacts
City, State (County) Miami, FL 33127   (Miami-Dade County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Fitness Center, Office, Parking Garage
Contracting Method
Project Status Building in Operation as of first quarter 2021
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use.

Details

1 Office, 10 Stories Above Grade, 511,058 SF New Construction, Fitness Center, Parking Garage.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents