Similar Projects
USDA Water Main Improvements Bogue Chitto Highway 22 Water Treatment Plant Filter Rehabilitation
Renovation, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Selma, AL 36701

USDA Water Main Improvements Bogue Chitto Highway 22 Water Treatment Plant Filter Rehabilitation
Renovation, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Selma, AL 36701

Contract "2" - New Well No. 5A at the R.j. Chandler Water Treatment Plant
New Construction, Infrastructure
Post-Bid
$150,000 CJ est. value
Selma, AL 36701

Contract "2" - New Well No. 5A at the R.j. Chandler Water Treatment Plant
New Construction, Infrastructure
Post-Bid
$150,000 CJ est. value
Selma, AL 36701

Contract "2" - New Well No. 5A at the R.j. Chandler Water Treatment Plant
New Construction, Infrastructure
Post-Bid
$150,000 CJ est. value
Selma, AL 36701

Multi-Use Concrete Trail - Old Cahawba Archaeological Park
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Orrville, AL 36767

Sidewalk Improvements Along Marie Foster Street
Infrastructure
Post-Bid
$715,000 CJ est. value
Selma, AL 36703

Additions and Renovations to Selma School of Discovery Demolition Project
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Selma, AL 36701

Marina Dock Enhancement Project
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Selma, AL 36701

Residential Water Service Connections in the Bogue Chitto Area
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Selma, AL 36701

Drainage System Improvements for Wallace Community College Selma
Infrastructure
Post-Bid
$400,000 CJ est. value
Selma, AL 36703

Murphy #5692/#7903 / Selma
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$2,000,000 CJ est. value
Selma, AL 36701

Selma, Alabama Flood Risk Management and Bank Stabilization Project Industry Day
Infrastructure
Design
$500,000 CJ est. value
Selma, AL 36701

Contract 1 - Rehabilitation of Well No. 8 (Lincoln Drive)
Infrastructure
Post-Bid
$350,000 CJ est. value
Selma, AL 36701

Constructing the Planing, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-41
Infrastructure
Results
$2,511,574 CJ est. value
Whites Bluff, AL 36767

Last Updated 01/08/2024 06:04 PM
Project Title

Re-Bid Wastewater Treatment Plant and Pump Station Upgrades

Physical Address View project details and contacts
City, State (County) Selma, AL 36701   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

(Replacement of Franklin Street Pump Station; Rehabilitation of Pump Stations 1 and, 4; and Re-sealing of Digester Tops at the Valley Creek WWTP) The OWNER reserves the right to waive any informalities, or reject any or all Bids, and to award the Contract to the lowest responsible, responsive bidder. Each BIDDER is required to file with his or her Bid either a Cashiers Check drawn on an Alabama bank or a Bid Bond executed by a surety company duly authorized and qualified to make such bonds in the State of Alabama, payable to the WATER WORKS AND SEWER BOARD OF THE CITY OF SELMA for an amount not less than five percent (5%) of the total amount of the Bid. Performance and Payment Bonds and evidence of insurance as required in the Bid documents will be required at the signing of the Contract. All BIDDERS bidding in amounts exceeding $50,000 must be licensed under the Provision of Title 34, Chapter 8, Code of Alabama, 1975, as amended, and must be licensed for the type of work on which the Proposal is submitted. BIDDERS must show evidence of license before bidding or Bid will not be received or considered; the BIDDER shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. No BIDDER may withdraw his or her Bid within sixty (60) days after the actual date of the opening thereof. Every request for such interpretation should be in writing addressed to HSA ENGINEERS, INC. and sent via email to Meredith.hsaeng@gmail.com a minimum of 48 hours prior to the Bid Opening.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents