Similar Projects
New London Wolf River Avenue Redevelopment Utility Reconstruction
Infrastructure
Bidding
New London, WI 54961

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

2021 Minor Street Improvements
Post-Bid
Clintonville, WI 54929

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

C. Waupaca, Main Street, Badger Street to Granite Street; C. Waupaca, Main Street, Badger Street to Granite Street
Results
WI

Grove Street Reconstruction
Post-Bid
Iola, WI 54945

Werner-Allen Rd Sanitary Sewer and Street Repaving
Results
New London, WI

Town of Saint Lawrence Road Improvements
Post-Bid
Ogdensburg, WI

STH 76 - New London, WI Central RR - CTH JJ
Results
New London, WI

Buettner Road - Construct A 2" Asphalt Wedge and Overlay 20` X 4,370 LF
Infrastructure
Post-Bid
Fremont, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Petersen Road Project, Wedging
Infrastructure
Post-Bid
WI

2021 Street and Utility Improvements
Results
Clintonville, WI 54929

Lind Center Road
Infrastructure
Post-Bid
Waupaca, WI

STH 76 - New London, CTH JJ - Lily of the Valley Drive
Results
New London, WI 54942

Last Updated 10/01/2021 05:16 PM
Project Title

Swan Road Project LRIP

Physical Address View project details and contacts
City, State (County) Manawa, WI 54949   (Waupaca County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is part of Local Road Improvement Program. Project consists of 1 mile (5280 feet) of reclaimed pavement, with 4 inches of 1 ¼ inch gravel; Hot Mix Asphalt using type 4LT58-28. Pavement will be placed 18 feet in width, with a compacted thickness of 3.0”. Driveway openings shall have a 1 foot asphalt approach placed at each entrance. Shoulders will be placed 2 feet wide on each side of the newly paved roadway, using ¾” limestone gravel. Driveway approaches shall have ¾” gravel placed to blend the driveways into the newly placed shoulder material

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents