Similar Projects
Sanitary Sewer Improvements 2019
Post-Bid
Less than $1,350,000 est. value
Carroll, OH

MRI/Sewer-Rehabilitation
Post-Bid
Less than $325,000 est. value
Cincinnati, OH 45221

Strivers/River Roads Sewer, Contract 4
Results
Less than $257,852 est. value
Aberdeen, OH

Group 2 Sanitary Sewer
Results
Bucyrus, OH

Campus Green Garage Sewer Lining
Post-Bid
Less than $350,000 est. value
Cincinnati, OH

Purdy Road Sanitary Sewer Extension
Results
Sardinia, OH

Emergency Repair Water and Sewer Line Services
Post-Bid
Niles, OH 44446

Midwest Materials Sanitary Sewer Improvements
Results
$640,000 est. value
North Perry, Perry, OH 44081

Scioto County - Interceptor Lining and Manhole Project
Post-Bid
Less than $1,824,700 est. value
Portsmouth, OH

Sunset Drive Area – Utility Improvements
Results
$350,000 est. value
Bay Village, OH

Spring Grove Sewer Replacement
Post-Bid
Less than $455,100 est. value
Cincinnati, OH 45204

WWTP Collection Improvements - Nelsonville City
Results
Less than $870,000 est. value
Nelsonville, OH 45764

Lock 9 Park Utility Project
Results
Less than $581,247 est. value
Piqua, OH 45356

Third Street Sanitary Sewer Extension
Results
Less than $76,415 est. value
Delphos, OH 45833

Sanitary Sewer Lining
Results
Middletown, OH 45042

Last Updated 08/04/2020 10:06 AM
Project Title

Construction of the Church Street Combined Sewer Separation Improvements

Physical Address View project details and contacts
City, State (County) Oak Harbor, OH   (Ottawa County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of a new storm sewer to be installed in Church Street from South Railroad to a new outlet to the Portage River, on the East side of the U.S. Bank. A connector storm sewer is also being installed in Main Street from Church Street to Locust Street. The existing combined sewer is being removed. A new sanitary sewer is being installed on Church Street parallel to the storm sewer as part of separating the existing Church Street combined sewer. The Project also includes replacing water main and the total reconstruction and widening of the asphalt road on Church Street. The Project consists of constructing approximately 8,600 lineal feet of 6-inch to 84-inch storm sewer; 9,100 lineal feet of 6-inch to 21-inch sanitary sewer; 360 lineal feet of 60-inch and 48-inch by 76- inch horizontal elliptical outfall sewer; 3,500 lineal feet of water line replacement; and 2 headwalls on the Portage River

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents