Similar Projects
Police Department Chiller Unit - 3603022 - City of Cedar Rapids
Alteration
Conception
Cedar Rapids, IA 52404

Animal Control HVAC Upgrades - 3604016 - City of Cedar Rapids
Alteration
Conception
$140,000 est. value
Cedar Rapids, IA 52404

Mills County Courthouse Restroom Remodel
Renovation
Design
$10,000 est. value
Glenwood, IA 51534

Ida Grove City Hall project
New Construction, Infrastructure - 4,700 SF
Design
$1,490,000 CJ est. value
Ida Grove, IA 51445

HVAC Upgrades Keokuk County Courthouse
Alteration
Bidding
Sigourney, IA 52591

Renovation of Administration Annex and New Main Entrance for Courthouse Complex
Renovation
Bidding
$2,400,000 CJ est. value
Ida Grove, IA 51445

Hancock County Courthouse/LEC HVAC Upgrades
Renovation
Sub-Bidding
$100,000 CJ est. value
Garner, IA 50438

Hancock County Courthouse/LEC HVAC Upgrades
Renovation
Sub-Bidding
$100,000 CJ est. value
Garner, IA 50438

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Bettendorf High School – Dust Collector Replacement
Alteration
Results
Bettendorf, IA 52722

Aquatic Center HVAC Replacement
Alteration
Results
North Liberty, IA 52317

City Hall Expansion (2nd Floor) - ADMN-18-001 - City of Norwalk
Addition
Conception
$700,000 CJ est. value
Norwalk, IA 50211

Ames City Hall Custodial Services Contract
Term Contract
Sub-Bidding
Ames, IA 50010

Chiller Replace - Roundy Elementary School
Alteration
Post-Bid
Columbus Junction, IA 52738

Last Updated 08/09/2022 09:04 AM
Project Title

Cherokee County Courthouse HVAC Retrofit

Physical Address View project details and contacts
City, State (County) Cherokee, IA 51012   (Cherokee County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Capitol/Court House/City Hall, HVAC
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Complete HVAC system replacement in entire building. *Existing ceilings to be replaced as shown on the plans. *Minor remodeling as shown on the plans. *Electrical work as required for HVAC retrofit, ceiling replacement and remodeling. Construction Contract: Bids will be received for a single Contract to include all trades. All bids shall be filed on forms included in the Project Manual, furnished by the Engineer, sealed and plainly marked. Any alteration of the bid form may be cause for rejection of the proposal. Each bid shall be made on the form furnished by the Engineer, and must be accompanied by a deposit of money, Certified Check, Cashier's Check, or Credit Union Certified Share Draft, or a Bid Bond to be executed by a corporation authorized to contract as a surety in the state of Iowa, in an amount equal to five percent (5%) of the amount of the Bid, made payable to Cherokee County, Cherokee, Iowa, and may be cashed by the Board as liquidated damages in the event the successful Bidder fails to enter into a Contract and file bond satisfactory to the Board assuring the faithful fulfillment of the Contract and maintenance of said improvements as required by law, the provisions of this notice and the Contract Documents within ten (10) days after acceptance of his Bid. State Sales Tax: This project is tax exempt. Do not include state sales tax in any calculation of Bid totals. Contractor will be provided with Iowa sales tax exemption number for this project. By virtue of statutory authority, preference will be given to products and provisions produced within the State of Iowa, to the extent lawfully required under Iowa statutes. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. Failure to submit a fully complete and accurate Bidder Status Form with the Proposal may result in the Proposal being deemed non-responsive and may result in the Proposal being rejected. Bid Security of the two lowest Bidders will be retained until contract has been awarded and executed, but no longer than 30 days after the opening of bids. No Bidder may withdraw their bid within 30 days after opening of bids. The successful Bidder will be required to furnish a Performance Bond and Material and Labor Payment Bond in an amount equal to one hundred percent (100%) of the Contract Sum, issued by a responsible surety approved by the Board and shall guarantee the faithful performance of the Contract and terms and conditions therein contained and the maintenance of said improvements pursuant to the provisions of the Contract Documents. Bids shall remain in effect for a period of thirty (30) days, commencing on bid due date. Monthly estimates will be paid to the Contractor as the work progresses in amounts equal to ninety-five percent (95%) of the Contract value of the work completed during the preceding calendar month. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work, partially or totally completed. Final payment of the five percent (5%) retainage due to the Contractor will be made thirty (30) days after final acceptance of the work under the Contract by the Owner if no claims are on file and after receipt of satisfactory evidence that all claims pertaining to such Contract have been paid in full as provided in the Contract Documents for said work. Fabrication of new work shall begin immediately after contracts are signed and insurance certificates are approved. Work on-site to begin January 12, 2023. The Contractor shall coordinate the construction start date with the Owner. The substantial completion date will be extended if the on-site construction start date is delayed. Verify work schedule with Owner and Engineer. The complete system shall be substantially complete by May 12, 2023. The Board reserves the right to reject any or all bids, re-advertise for all bids and to waive any or all formalities that may be in the best interest of Iowa.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents