Similar Projects
Last Updated | 08/11/2022 04:34 PM |
Project Title | Jie Ming Mandarin Immersion Addition and Renovation - Part 2 - Bid Package#3 (Electrical Temporary Conditions) |
Physical Address | View project details and contacts |
City, State (County) | Saint Paul, MN 55116 (Ramsey County) |
Category(s) | Education, Single Trades |
Sub-Category(s) | Electric, Vocational School |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $119,200 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | WS 26B - Jie Ming Electrical Temporary Conditions. - The intent of this Work Scope is to include electrical and low voltage work that will be required to allow for demolition of the existing restrooms, cafeteria and kitchen while also maintaining functioning electrical and low voltage systems in the existing building. Note that the renovation of the existing building spaces will not occur until the summer of 2023, so these spaces need to be fully functional for the fall of 2022 until the summer of 2023. This Work Scope is intended to include the demolition and disconnection / make safe of electrical and low voltage items to allow for the installation of a temporary construction barrier (by others) and the demolition of the existing structure (by others). The full scope of work for electrical and low voltage will be issued in the next bid package. Deadline for contractor questions (in GetAll) 5/26/2022 2:00pm local time. Location: 1845 Sheridan Ave. W. Saint Paul, MN 55116 P.no- 21269, 21005927.00, R21-4117.000 Construction began on July 21, 2022 and is expected to be completed in 2024. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |