Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

Runway 14L/32R Rubber Removal and Marking
Infrastructure
Bidding
$113,000 CJ est. value
Mascoutah, IL 62258

Public Safety Building at Emerson Park Metro Station
New Construction, Infrastructure - 16,113 SF
Bidding
$15,000,000 CJ est. value
East Saint Louis, IL 62201

Olivette Neighborhood Street Improvements - Phase 3
Post-Bid
Belleville, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Cleaning of the Missouri Avenue Pump Station on I-55/I-64
Results
Mascoutah, IL 62258

Millstadt - PY 2019 CDBG - Laurel Street Improvements - 600 and 700 Block - Phase 1
Results
Less than $95,000 est. value
Millstadt, IL

Jackie Joyner Kersee Sports and Recreation Complex
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
East Saint Louis, IL 62204

Jackie Joyner Kersee Sports and Recreation Complex
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
East Saint Louis, IL 62204

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

Schranz Park Shared-Use Path and Sidewalk Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Swansea, IL 62226

Aggregate
Post-Bid
Freeburg, IL

Building Demolition and Site Work - AMP 3
Demolition
Results
Centreville, IL

Last Updated 08/08/2022 12:33 PM
Project Title

New Shoulders on IL 163

Physical Address View project details and contacts
City, State (County) Millstadt, IL 62260   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,337,628 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

4.6 miles of new shoulders on IL 163 from IL 157 to South Prairie DuPont Creek. Region 5 District 8 Federal Project # HSIPX0JV(696) County(s) St. Clair Key Route(s) FAU 9368, FAP 609 Marked Route(s) IL 163 Section(s) 76SR-1 State Job #(s) C-98-110-19 PPS #(s) 8-08800-2701 Completion Date : 85 Working Days Questions not accepted as of July 26, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, June 24, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 030 - New Shoulders on IL 163

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents