Similar Projects
Lincoln Avenue South of Wascher Drive To South of Killarney - City of Urbana
Infrastructure
Conception
$1,930,550 CJ est. value
Urbana, IL 61801

Pennslyvania Avenue West Of Orchard Street Resurfacing To Race - City of Urbana
Infrastructure
Conception
$617,150 CJ est. value
Urbana, IL 61801

Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

Quincy Regional Airport - New Apron, Taxi Lane, and Road
New Construction, Infrastructure
Design
$2,400,000 CJ est. value
Quincy, IL 62305

Payson Avenue South 5th to South 8th
Infrastructure
Bidding
$3,150,000 CJ est. value
Quincy, IL 62301

Shimer Square Phase 1A
Term Contract, Infrastructure, Renovation
Bidding
Mount Carroll, IL 61053

Concrete Replacement Work at Indian Hills (IL 16-1)
Infrastructure
Post-Bid
$130,000 CJ est. value
Quincy, IL 62301

Shimer Square Phase 1A
Term Contract, Infrastructure, Renovation - 49,875 SF
Post-Bid
Mount Carroll, IL 61053

4th Street Reconstruction, Drainage and Water System Improvements
Infrastructure
Results
$709,800 CJ est. value
Milledgeville, IL 61051

Site Improvements at J.W. Eater Junior High School Project
Infrastructure
Results
Rantoul, IL 61866

Hotel Royer Tapestry Collection by Hilton
Renovation, Infrastructure
Construction
$8,693,115 CJ est. value
Urbana, IL 61801

Interchange Reconstruction: I-57
Demolition, New Construction, Infrastructure
Construction
$125,999,995 CJ est. value
Champaign, IL 61822

Windsor Road Resurfacing
Infrastructure
Pending Verification
$300,000 CJ est. value
Urbana, IL 61801

General Mills Distribution Center
New Construction, Infrastructure - 1,300,000 SF
Pending Verification
$80,000,000 CJ est. value
Flora Township, IL 61008

New Fire Station #2 - 40805 - City Of Urbana
New Construction, Infrastructure
Conception
$2,741,400 CJ est. value
Urbana, IL 61802

Last Updated 03/20/2023 12:08 PM
Project Title

Vermont Sanitary District Lift Station Replacement

Physical Address View project details and contacts
City, State (County) Vermont, IL 61484   (Fulton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $589,779 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 20, 2023, the project has been awarded. A timeline for construction has not been confirmed. Construction of (Briefly describe nature, scope, and major elements of the work: Lift Station Replacement. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Water Pollution Control Loan Program (35 IAC Part 365), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), Illinois Works Jobs Program Act (30 ILCS 559/20-1), and the federal "Build America, Buy America Act" requirements contained in the Infrastructure Investment and Jobs Act, Pub. L. No. 117-58. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4." Any questions concerning the Bidding Documents should be emailed to Mr. Andrew Logsdon of Bruner, Cooper and Zuck, Inc. at all@bczengineering.com. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents