Similar Projects
Marquette University School of Business and Innovation
New Construction
Design
$60,000,000 est. value
Milwaukee, WI 53233

(CBE) Lab Renovation
Renovation - 24,000 SF
Design
Madison, WI 53715

Chemistry Building and Central Utilities Expansion - GPC
New Construction, Addition
Bidding
$84,000,000 est. value
Milwaukee, WI 53211

Chemistry Building and Central Utilities Expansion - GPC
New Construction, Addition
Bidding
$84,000,000 est. value
Milwaukee, WI 53211

Building L (Centennial Hall, Fitness & Testing Centers) Interior Remodel
Post-Bid
Cleveland, WI 53015

Oshkosh Campus Monument Signs
Post-Bid
Oshkosh, WI

UW Research Lab Room 5018
Renovation
Results
Less than $171,000 est. value
Madison, WI 53705

Custodial Offices Relocation
Results
$160,000 est. value
Oshkosh, WI 54901

Truax Campus Civil, Interior Design, Architecture Remodel
Renovation
Construction
Madison, WI 53704

Music Laboratories Renovation - GPC
Renovation - 27,000 SF
Bidding
$5,000,000 est. value
Eau Claire, WI 54703

Northeast Technical College Outdoor Storage Rack
Post-Bid
Green Bay, WI 54303

Chemistry 2nd Floor Wang Lab Renovation
Renovation
Results
Less than $1,010,000 est. value
Madison, WI 53706

Structural Repair
Renovation
Bidding
$190,000 est. value
Madison, WI 53711

WCTC V Building
- 9,432 SF
Post-Bid
$1,500,000 est. value
Pewaukee, WI 53072

Agricultural Dean's Residence Remodel
Renovation
Results
Less than $335,000 est. value
Madison, WI 53706

Last Updated 10/15/2021 07:29 AM
Project Title

Music Laboratories Renovation -MEP

Physical Address View project details and contacts
City, State (County) Eau Claire, WI 54703   (Eau Claire County)
Category(s) Education, Laboratory
Sub-Category(s) College/University, Laboratory
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of selective demolition to interior masonry partitions and portions of the electircal and mechanical systems. Construction of gypsum board and metal framed ceilings and walls; installation of acoustic ceilings and wall treatments; installation of light fixures; installation of mechanical distribution and air handler, installation of audio/visual equipment. The work area includes the first floor instrumental and vocal rehearsal rooms and adjacent classrroms, and second floor percussion and practice rooms which are all located primarly in the southern portion of th building and totaling approximately 27,000 square feet. Exterior site work is also part of the project

Details

College/University, Renovation, Laboratory, 27,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents