Similar Projects
Endimal Chemical Feed
Infrastructure, Alteration
Bidding
$120,000 est. value
Greensboro, NC

HVAC Repair and Maintenance Services
Term Contract
Post-Bid
NC

HVAC Water Treatment
Term Contract
Post-Bid
Greensboro, NC 27401

HVAC Replacement - Carl Chavis YMCA
Results
High Point, NC

HVAC Electric Motor and Pump Repair Services
Results
Greensboro, NC 27401

Chiller Plant Replacement for Southern Elementary School
Post-Bid
Greensboro, NC 27406

Split Dx System Replacement And Installation - 21
Results
Greensboro, NC

Jet Bridges Pc Air And Gpus
Post-Bid
Greensboro, NC

Cooling Tower Replacement and Installation at Bryan Building
Results
Greensboro, NC 27412

Air Conditioning System Trainer With H-Block
Post-Bid
Greensboro, NC 27407

NCA and T - Fume Hood Replacements
Results
$500,000 est. value
Greensboro, NC

Elm Towers and Morehead Courts HVAC Renovation
Alteration
Post-Bid
High Point, NC

Chiller Plant Replacement for Northwest Middle School
Results
Greensboro, NC 27409

Hood Cleaning Summer 2021
Alteration
Post-Bid
Greensboro, NC

Cone ES RTU Replacement
Results
Greensboro, NC 27405

Reported 01/07/2022 12:00 AM
Project Title

Chiller Replacement for Andrews High School

Physical Address View project details and contacts
City, State (County) High Point, NC 27265   (Guilford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 12/06/21
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all materials and labor for the project Chiller Replacement for Andrews High School. Work in the project includes: Demolish and replace the existing 200-ton water cooled chiller including chiller pump, building loop pump and condenser water pump including all piping modifications, controls, electrical, makeup water system, and new chiller room controls. Flush, fill and vent system and provide cleaner and water treatment for the entire closed chilled water system and for the existing tower water system. Drain, clean, flush and re-charge building loop with glycol. Provide a new ventilation system for room.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents