Similar Projects
South 23rd Street Sewer Rehabilitation - Phase II - PW-24-12 - City Of Council Bluffs
Infrastructure
Conception
$1,000,000 CJ est. value
Council Bluffs, IA 51501

South 23rd Street Sewer Rehabilitation - Phase II - PW-24-12 - City Of Council Bluffs
Infrastructure
Conception
$1,000,000 CJ est. value
Council Bluffs, IA 51501

Treynor Family Recreation Complex
New Construction, Infrastructure
Design
$4,650,000 CJ est. value
Treynor, IA 51575

Cattlemen's Heritage Beef Processing Plant
New Construction, Infrastructure
Design
$54,000,000 CJ est. value
Council Bluffs, IA 51501

Valley View Dog Park - Phase II - Rebid
Infrastructure
Bidding
$2,000,000 CJ est. value
Council Bluffs, IA 51503

Valley View Dog Park - Phase II - Rebid
Infrastructure
Bidding
$2,000,000 CJ est. value
Council Bluffs, IA 51503

East Orchard Avenue Water Main Relocation
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Council Bluffs, IA 51503

First Avenue Trail Project -Trail Project
Infrastructure
Post-Bid
$2,000,000 est. value
Council Bluffs, IA 51501

HMA Resurfacing
Infrastructure
Results
IA

Hma Resurfacing
Infrastructure
Results
IA

Pollard Games Council Bluffs Expansion
Addition, Demolition, Infrastructure - 40,000 SF
Pending Verification
$9,400,000 CJ est. value
Council Bluffs, IA 51501

Valley View Sewer Rehabilitation - PW-27-10 - City Of Council Bluffs
Infrastructure
Conception
$1,000,000 CJ est. value
Council Bluffs, IA 51503

Bahnsen Park Replica Baseball Field (Yankee Stadium) - PR-23-05 - City of Council Bluffs
Infrastructure
Design
$300,000 CJ est. value
Council Bluffs, IA 51501

2023 5th Street Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Neola, IA 51559

450th Street Storm Sewer Improvements
Infrastructure
Post-Bid
$322,688 CJ est. value
Avoca, IA 51521

Last Updated 05/13/2023 10:01 AM
Project Title

Reiver Suites Resurface Parking Lot

Physical Address View project details and contacts
City, State (County) Council Bluffs, IA 51503   (Pottawattamie County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes: The contractor shall furnish all bonds, proof of insurance, labor, materials, clean-up and guarantee to complete resurfacing the parking lot between the Reiver Suites I and II complexes. All material will be of professional grade and quality and will be installed according to manufacturer guidelines. Installation of two (2) inch application of hot mix asphalt overlay and compact it over an existing asphalt parking lot. Edge mill approximately 12 out from concrete curb and gutter to allow for smooth transition. Clean and apply full tack coat to approximately 126,500 sq. ft. as per map, highlighted yellow. Bid will also include: Crack and Joint Sealing Sealcoating Layout and Lines Striping If you have any questions please contact Randy Novotny (rnovotny@iwcc.edu) or by phone (402) 587-1574. We suggest you may find it faster and/or easier to email questions. Installation of two (2) inch application of hot mix asphalt overlay and compact it over an existing asphalt parking lot. Edge mill approximately 12 out from concrete curb and gutter to allow for smooth transition. Clean and apply full tack coat to approximately 126,500 sq. ft. as per map, highlighted yellow. The contractor shall furnish all bonds, proof of insurance, labor, materials, clean-up and guarantee to complete resurfacing the parking lot between the Reiver Suites I and II complexes. All material will be of professional grade and quality and will be installed according to manufacturer guidelines Bid will also include: Crack and Joint Sealing Sealcoating Layout and Lines Striping If you have any questions please contact Randy Novotny (rnovotny@iwcc.edu) or by phone (402) 587-1574. We suggest you may find it faster and/or easier to email questions. A 5% bid bond is required No bidder may withdraw their proposal within 60 days after the bid opening. A 100% Performance Bond and Payment Bond will be required

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents