Similar Projects
Parkwood Drive Sewer - 50469 - City of Chico
Infrastructure
Conception
$636,649 est. value
Chico, CA 95928

Reconstruct Drainage
Infrastructure
Design
$4,164,000 est. value
Willits, CA 95490

Septic Tank, Lint Trap and Grease Trap Pumping Removal Services
Infrastructure
Bidding
Bishop, CA 93514

Talbert Channel Storm Drain Repair Project
Infrastructure
Bidding
$86,289 est. value
Fountain Valley, CA

River Trunk Realignment Gravity System Project
Infrastructure
Post-Bid
$24,970,000 est. value
Modesto, CA

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

PW Transit As-Needed Contract No. 2
Infrastructure, Alteration
Results
$3,000,000 est. value
San Francisco, CA

Removal and Transport of Grit, Scum/Sludge, and Storm Water
Infrastructure
Bidding
San Diego, CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

2022 Sewer Lateral Replacement Project
Infrastructure
Results
$175,000 to $225,000 est. value
San Carlos, CA

R Line Upgrade Phase 2 - Salt Creek Project
Infrastructure
Bidding
$800,000 est. value
Imperial, CA

Lake Mendocino (CVD) Septic Service
Alteration
Post-Bid
Ukiah, CA 95482

Spot Sewer Replacement No 43
Alteration
Results
$9,850,000 est. value
San Francisco, CA

2022 Albany-Stradley Sump Improvement Project
Infrastructure
Bidding
$450,000 to $500,000 est. value
Delano, CA

Reported 06/16/2022 10:35 AM
Project Title

Sub-basin BD Drainage Ditch - 50280 - City of Chico

Physical Address View project details and contacts
City, State (County) Chico, CA 95927   (Butte County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value Less than $266,845
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sub-basin BD drains large portions of southeastern Chico. The ditch drains into the Fair Street Detention Pond. Flows have overtopped the banks of the ditch recently. This project will conduct hydrological and hydraulic studies to determine the current capacity of the channel, and if deficiencies are found, there will be recommended improvements. This ditch is a conveyance system for the Comanche Creek Basin. The project is included in the City of Chico's FY 2021-2032 Capital Improvement Program (CIP). As of June 15, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated in 2022.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents