Similar Projects
Construction of a Water Project at the Hiwassee Utilities Commission Water Plant - Hiwassee Sodium Hypochlorite Building
New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
Charleston, TN 37310

Cefoperazone (CFP) Sodium Permanganate Conversion at Raw Water Intake
New Construction, Infrastructure
Bidding
$4,507,000 CJ est. value
Charleston, TN 37310

Freewill Road/Hensley Road Water Main Improvements
Post-Bid
Cleveland, TN 37312

Site Preparation/Excavation
Post-Bid
Cleveland, TN 37311

Cleveland High School Water and Sewer Improvements
Results
Cleveland, TN 37312

12th St Detention Structures
Infrastructure
Results
$892,120 CJ est. value
Cleveland, TN 37311

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Construction of the HDPE Pipe Replacement Project Phase 1
Infrastructure
Results
$300,000 est. value
Cleveland, TN

17th and 20th Water Service/Main Relocation
Infrastructure
Post-Bid
Cleveland, TN

22nd Street NW Waterline Extension
Infrastructure
Post-Bid
Cleveland, TN 37312

20th Street 12-Inch Water Main Relocation
Infrastructure
Post-Bid
Cleveland, TN

20Th Street/Foster Lane Site Development
Alteration
Post-Bid
Cleveland, TN

Spring Branch Water Main Extension
Infrastructure
Post-Bid
Cleveland, TN

Harris Creekroad SW and Tillie Road NE Waterline Extensions
Infrastructure
Post-Bid
Cleveland, TN 37312

Belleview Drive, South East Waterline Extension
Infrastructure
Post-Bid
Cleveland, TN 37323

Last Updated 08/30/2022 06:32 PM
Project Title

Charleston Elementary School - Reline Main Sewer Line

Physical Address View project details and contacts
City, State (County) Charleston, TN 37310   (Bradley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This request for quotes (RFQ) is submitted and available to qualified vendors for materials and installation of an 8" LED lining at Charleston Elementary School. The specific project provisions can be found in Attachment A. Charleston Elementary School 8797 Hiwassee Street Charleston, TN 37312 Approximately 300' of 8" LED lining of main sewer line o Grinding and cleaning of existing sewer line through 3 manholes o Installation of 8" LED liner and cutting in of any tie in o Running a camera to ensure ground water is not penetrating sewer line All bids must conform to the requirements presented in the Instructions to Bidders and Attachment A of this RFQ. To facilitate evaluation, all bids must be submitted on the form provided in this document as Attachment B. Bids not in conformity may be rejected. Additional brochures and descriptive material may be included. The Bradley County Board of Education reserves the right to use judgement factors in determining which proposal shall be in its best interest, and exercise of that judgement shall be binding upon all companies submitting bids. Thank you for your interest in submitting a bid. If you have any questions about the RFQ, please contact Chuck McKay at 423-478-8830 or Ellen Smith at 423-476-0620 ext. 2030.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents