Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Sewer Rehabilitation
Infrastructure
Bidding
El Cerrito, CA

Various Locations Sewer Replacement No 11
Infrastructure
Bidding
$4,100,000 est. value
San Francisco, CA

2018-2019 Sewer Replacement
Infrastructure
Post-Bid
$442,200 est. value
Modesto, CA

River Trunk Realignment Gravity System Project
Infrastructure
Post-Bid
$24,970,000 est. value
Modesto, CA

CIPP Fiberglass Pipe Lining
Infrastructure
Results
Sacramento, CA

Cast Iron Sewer Replacement FY 2020-2021 Package IV
Infrastructure
Results
$716,790 est. value
San Jose, CA

Kern River RD Toilet Site Work Project, Sequoia National Forest
Alteration
Design
$250,000 to $500,000 est. value
CA

Aeronautics Nut Tree Facility Improvements Project
Renovation, Infrastructure
Bidding
Vacaville, CA 95688

As-Needed Sewer Cleaning and Inspection (Fy22)
Infrastructure
Post-Bid
$1,400,000 est. value
San Francisco, CA

Miscellaneous Sanitary Sewer Repairs FY 20-21 (Package III)
Infrastructure
Results
$700,001 to $800,000 est. value
San Jose, CA

Septic Tank Pumping and Legal Disposal
Infrastructure
Bidding

Water and Wastewater Treatment Chemicals
Term Contract
Post-Bid
Clovis, CA

Sanitary Sewer Rehabilitation (Sub-Basin 85-202)
Alteration
Results
$5,900,000 est. value
Oakland, CA

Last Updated 03/25/2022 02:18 AM
Project Title

Upper Hillcrest Subbasin 4 Sewer Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Millbrae, CA 94031   (San Mateo County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To Removal and replacement of existing 6-inch or 8-inch sewer mains with 8-inch sewer mains using pipe reaming, pipe bursting, horizontal directional drilling (HDD), and open cut pipe replacement construction methods, sewer lateral reconnections & replacement, sewer manhole reconnections, cleanout and/or backflow prevention devices, sewer manhole installations and, surface restoration, traffic control, mobilization, manhole modifications, sewage bypassing and all other work

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents