Similar Projects
The Preserve Phase 4
New Construction, Infrastructure
Conception
$16,000,000 CJ est. value
Sherman, TX 75090

Mcgee Street Bridge - Erosion and Overlay Repairs - City of Sherman
Infrastructure
Conception
$900,000 CJ est. value
Sherman, TX 75092

Heritage Ranch - Phase 2-4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Sherman, TX 75092

Freedom Jeep Showroom Addition / Sherman
Addition, Demolition, Infrastructure - 9,887 SF
Design
$2,970,000 CJ est. value
Sherman, TX 75092

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Whitewright Nature Park Pond Renovation
Infrastructure
Bidding
$321,000 CJ est. value
Whitewright, TX 75491

Mass Grading Operations for Churchill
Infrastructure
Post-Bid
Van Alstyne, TX

Mantua Point Phase 2A and 2B Grading Package
Infrastructure
Post-Bid
Van Alstyne, TX

Chloramine Conversion and Take Point Improvements Project
Infrastructure
Results
Howe, TX

Whitewright Waterline Improvements
Infrastructure
Results
$752,421 est. value
Whitewright, TX

Home Place Partners - Gallagher Warehouse
New Construction, Infrastructure - 7,500 SF
Construction
$1,200,000 CJ est. value
Sherman, TX 75090

Classic Chevrolet Cadillac of Denison
New Construction, Infrastructure - 75,200 SF
Construction
$18,500,000 CJ est. value
Denison, TX 75021

Hampton Inn & Suites Sherman
New Construction, Infrastructure - 49,260 SF
Pending Verification
$6,000,000 CJ est. value
Sherman, TX 75092

QuikTrip #1915
New Construction, Infrastructure - 5,312 SF
Pending Verification
$725,000 CJ est. value
Sherman, TX 75090

Lamberth Road Expansion - Shady Oaks To Friendship Road - City of Sherman
Infrastructure
Conception
$4,600,000 CJ est. value
Sherman, TX 75090

Last Updated 02/16/2023 02:28 PM
Project Title

Lake Texoma Raw Water Intake Pump Station & Pipeline Project

Physical Address View project details and contacts
City, State (County) Denison, TX 75021   (Grayson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $75,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

*As of February 2023, a construction manager has been awarded. Since the operation of the proposed raw water pump station and pipeline is critical to the Citys capability to provide timely water services to existing customers, the construction must be substantially complete (in service and capable of pumping its intended capacity of raw water from Lake Texoma into the adjacent Randell Lake) by November 15, 2023, including a 30-day operational demonstration. Provisions for liquidated damages will be included in the contract. In addition, all remaining contract work, including final punch list items, must be complete within 60 days after substantial completion of the Project. Also, in addition to substantial and final completion, liquidated damages may apply to certain project milestones identified in the contract. The project is comprised of a new intake raw water pump station (vertical turbine pumps) and associated components with 30 MGD initial capacity and ability to expand in the future to 50 MGD. The project will also include construction of approximately 6,750 Linear feet of 42- inch raw water pipeline and an access road, lake intake channel, outfall structure, site development, environmental mitigation, site security, and installation of SCADA improvements for the pump station. More information is available in the enclosed Description of Work and Preliminary Design Documents.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents