Similar Projects
Pavement Preservation and Rehabilitation North - 2021
Infrastructure
Bidding
Arlington Heights, Mount Prospect, Palatine, Schaumburg, Streamwood, IL 60056

2022 Crack Filling/Seal Coating/Striping
Infrastructure
Bidding
IL

Arterial Resurfacing Project 89 - South Area
Post-Bid
Chicago, IL 60602

ADA Sidewalk Evaluation
Post-Bid
Richton Park, IL 60471

Bluestone and Granite Repair
Results
Oak Park, IL 60302

ORD Parking
Results
Chicago, IL 60602

(2,600-Ft) Resurfacing, Drainage Improvement
Infrastructure
Bidding
Des Plaines, IL

Water Main Valve Exercising
Term Contract
Post-Bid
Orland Park, IL

Quiet Zone Safety Measures
Results
Franklin Park, IL 60131

Pavement Reconstruction
Infrastructure
Bidding
Tinley Park, IL

Purchase and Delivery of Fire Hydrant(S), Auxilary Valve(S), and Accessories
Post-Bid
Des Plaines, IL

Water Main Improvements
Results
Less than $1,500,000 est. value
Mount Prospect, IL 60056

Construction Management Services Pavement Preservation and Rehabilitation Services at Various Locations
Post-Bid
Chicago, IL

2020 - Hot Mix Asphalt
Results
Crestwood, IL 60418

Asphalt Paving & Related Materials & Services - 3 Year Contract
Renovation, Term Contract
Post-Bid
Chicago, IL 60638

Last Updated 01/05/2022 08:26 AM
Project Title

First Street/Center Avenue Improvements

Physical Address View project details and contacts
City, State (County) Northbrook, IL   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Storm Sewer Removal and Installation, Drainage Structure Removal and Installation, Water Main Installation, Concrete Sidewalk Removal and Replacement, Hot-Mix Asphalt Pavement Patching, Driveway Removal and Replacement and Landscape Restoration Along First Street And Center Avenue

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents