Similar Projects
Newton Farms Park Improvement - City of West Valley City
Infrastructure
Conception
$625,000 CJ est. value
West Valley City, UT 84128

Develop Maple Meadows II - City of West Valley City
Infrastructure
Conception
$2,800,000 CJ est. value
West Valley City, UT 84120

Olympia Hills
New Construction, Infrastructure
Design
$2,000,000,000 CJ est. value
Herriman, UT 84096

Chrome Works
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Salt Lake City, UT 84101

SLC DPU - New WRF Construction
New Construction, Infrastructure
Bidding
$60,000 CJ est. value
Salt Lake City, UT 84111

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Bueno Avenue Apartments
New Construction, Infrastructure
Post-Bid
$24,000,000 CJ est. value
Salt Lake City, UT 84102

RFQ Contractor - 2021 UDOT Tie Fork Rest Area Landscaping Upgrades
Infrastructure
Results
$192,640 CJ est. value
Spanish Fork, UT 84660

University Hospital Parking Terrace (UHPT) North Parking Garage (Lot 50) Concrete Repairs
Infrastructure
Results
$126,080 CJ est. value
Salt Lake City, UT 84132

Brix
New Construction, Infrastructure
Construction
$55,000,000 CJ est. value
Salt Lake City, UT 84101

Pura Vita Senior Housing
New Construction, Infrastructure
Construction
$6,000,000 CJ est. value
West Jordan, UT 84088

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

South Main Street Apartments / Salt Lake City
New Construction, Infrastructure - 8,400 SF
Pending Verification
$150,000,000 CJ est. value
Salt Lake City, UT 84101

Develop Phase 1 of New Regional Park - City of West Valley City
Infrastructure
Conception
$5,000,000 CJ est. value
West Valley City, UT 84119

At 2100 Apartments II
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Salt Lake City, UT 84115

Last Updated 09/19/2023 11:04 AM
Project Title

RFP Design - C1DA--660-810 Expand Cardiology and Support Addition Minor Design - Salt Lake City (VA-23-00080437)

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84108   (Salt Lake County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Hospital, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Description THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR STANDARD FORM (SF) 330 ARCHITECT-ENGINEER QUALIFICATIONS PACKAGES ONLY. ALL INFORMATION NEEDED TO SUBMIT SF 330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. THE GOVERNMENT WILL NOT PAY, NOR REIMBURSE, ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. 1. GENERAL INFORMATION Veterans Health Administration (VHA) Program Contracting Activity Central (PCAC) is seeking sources and intends to award a firm fixed price design contract for Architect-Engineering (A-E) services for the development of complete construction documents, which include working drawings, specifications, and reports, and construction period services for Project # 660-810 Cardiology and Administrative Support Addition Design Salt Lake City Veteran s Affairs Medical Center Salt Lake City, Utah. The A-E Services contract that is anticipated to be awarded will be procured in accordance with the Selection of Architects and Engineers statute [formerly known as the Brooks Architect Engineer Act], Federal Acquisition Regulation (FAR) subpart 36.6 Architectural and Engineering Services, VA Acquisition Regulation (VAAR) 836.6, and VA Acquisition Manual (VAAM) M836.6 Architect-Engineer Services. In accordance with FAR 36.209, Construction Contracts with Architect-Engineer Firms, no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative. 2. PROJECT INFORMATION This project is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. The NAICS code for this procurement is 541330 Engineering Services and the annual small business size standard is $25.5M. A full design team is required to complete this project. The VA expects to award the anticipated A-E contract in March 11 2024. The anticipated period of performance for completion of design is 240 calendar days after notice of award (NOA). The VAAR magnitude of construction is between $10,000,000 and $20,000,000. Please note that the 240-calendar-day period of performance for the design completion begins with the issuance of the NOA and that a notice to proceed (NTP) will not be issued for the completion of a design project. 3. A-E SELECTION PROCESS Firms submitting SF 330s in response to this announcement, not later than the closing date and time specified herein and in accordance with submission requirements, will be considered for evaluation. The selection will be made as follows: SF 330s will be evaluated in accordance with the primary selection criteria as stated in this pre-solicitation notice. These evaluations will determine the most highly qualified firms for this particular requirement. In accordance with FAR 36.602-3(c), at least three of the most highly qualified firms will then be notified of the Government s intent to hold discussions. All firms not invited to participate in discussions will be notified at this time. In accordance with FAR 36.607(b), any requested debriefings of successful and unsuccessful firms will be held after final selection has taken place and will be conducted, to the extent practicable, in accordance with 15.503, 15.506(b) through (f), and 15.507(c). Note that 15.506(d)(2) through (d)(5) do not apply to architect-engineer contracts. Discussions will be held with the most highly qualified firms in the form of written responses. The firms invited to participate in discussions will be notified by email and provided further instructions, including any questions or topics to address. Following the completion of discussions, the firms will be evaluated and ranked based on the primary and (if necessary) secondary selection criteria. The final evaluation and ranking will consider the SF 330 submission for each firm, as well as additional information obtained via discussions. The highest rated firm will be selected to receive the solicitation and engage in negotiations. The solicitation will be issued to the highest rated firm as a Request for Fee Proposal (RFP). All SOW attachments and site-specific documentation will be provided to the highest rated firm with the RFP. A site visit will be authorized during the negotiation process. An award will then be made as long as the negotiation of rates and hours leads to a fair and reasonable determination of the final contract price. If negotiations with the highest rated firm are unsuccessful, the firm will be notified that negotiations have been terminated. Negotiations will then be initiated with the next highest rated firm, and so on until award can be made. 4. SELECTION CRITERIA: Firms responding to this notice will be evaluated and ranked using the primary and secondary selection criteria listed below. The factors are listed in descending order of importance. The evaluation will consider how each factor is addressed and how it is formatted to coincide with the selection criteria. Primary Selection Criteria: Professional Qualifications (Sections C through E) necessary for satisfactory performance of required service. The A-E shall demonstrate they are able to sign and stamp each drawing by individuals licensed in any state in the United States for the key positions listed below. Provide Professional License numbers and/or proof of Licensure. The evaluation shall consider the specific experience (minimum of five years) and qualifications (i.e., education, training, registration, certifications, overall relevant experience, and longevity with the firm as full time employees) of personnel proposed for assignment to the project, and their record of working together as a team when evaluating professional qualifications. The lead designer in each discipline must be registered but does not have to be registered in the particular state where the project is located. Key positions and disciplines required for this project include but are not limited to: Architect (LEED certified), CADD Technician, Registered Communications Distribution Designer (RCDD), Estimator, Civil Engineer, Electrical Engineer, Environmental Engineer, Fire Protection Engineer, Industrial Hygienist, Mechanical Engineer, Plumbing, Project Manager, Quality Assurance, Structural Engineer, Physical Security Specialists, and Commissioning Agent. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ___________________, [company] __________________, certify that the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not certified SDVOSBs by the Small Business Association s Veteran Small Business Certification (VetCert) in compliance of VA Acquisition Regulation (VAAR) 852.219-75. The information provided in sections C through E of SF 330 will be used to evaluate this evaluation factor. Do not include this information in section H, unless it is pertinent to support the information listed in the other sections. Specialized Experience and technical competence (sections F, G, and H): in the design and construction period services shall be provided for network infrastructure installation, renovations, or upgrades. Projects experience should include upgrading large scale (multi-building with multiple generational OIT systems) fiber optics, data cable, structured cabling, electrical distribution design, electrical upgrades, uninterruptable power systems (UPS), electrical bonding, building management systems/building automation systems (BMS/BAS), HVAC, IT room renovations/expansion/relocations, Data Centers/Server Rooms reconfiguration, and physical security upgrades, duct bank and direct boring operations. Other specialized experience includes experience in critical path scheduling, fire protection, construction infection control protocols, energy conservation, transition, and sustainable design practices. Submissions shall include no more and no less than five (5) recent and relevant Government and private experience projects similar in size scope and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past five (5) years. Each project shall include the following: Project title, location and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e. prime contract, Teaming Partner or subcontractor Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates Total dollar value of the project Contract number associated with the project. Section G will used to evaluate the prior experience of the prime firm and any key subcontractors working together on the provided relevant projects. The evaluation will also consider narratives addressing the following topics in Section H. Simply re-stating this list in Section H will not be sufficient. The narrative of how the firm addresses each of these will be evaluated. The management approach The coordination of disciplines and subcontractors Quality control procedures, and Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. Capacity (section H): The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of key disciplines to perform the work in the required time. Provide the available capacity of key disciplines by providing current project workload, inclusive of all projects awarded by the VA during the previous 12 months and the full potential value of any current indefinite delivery contracts. Offeror shall clearly state their available capacity presenting workload percentages for the key disciplines and/or team members. Also, the offeror must provide the completion percentages and expected completion date for the VA projects awarded in the previous 12 months. The information for this factor shall be provided in Section H of the SF 330. Please ensure the capacity applies toward the team/personnel provided in the SF 330. Past performance (section H): Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. Past performance will be evaluated for all projects provided in Section F. The Contractor Performance Assessment Rating System (CPARS) database will be reviewed to evaluate the projects that have a CPARS entry. CPARS are not required to be submitted with the SF330 submission. The contract number for the project must be submitted with each project in Section F so CPARS can be reviewed in the database. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. The PPQ should be rated and signed by the evaluator. In the event that a firm does not receive a requested complete PPQ from an evaluator prior to the time for submission, the firm shall submit the partially completed PPQ with Section 1 and the Evaluator Information in Section 2 completed. Ensure a POC is listed with the project title/contract number. The VA will make reasonable attempts to contact the POC upon submission for PPQ completion. Evaluations may also include additional performance related from the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. The Government reserves the right to contact any POC listed on a CPARS report or PPQ. Evaluations will consider superior performance ratings on recently completed VA projects as well as the reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. If appropriate, the record of significant claims against the firm because of improper or incomplete architectural and engineering services may be evaluated. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified. All projects provided in the SF 330 must be completed by the office/branch/individual team member performing the work under this contract. The information for this factor shall be provided in Section H of the SF 330. For PPQs, please utilize the attached PPQ document. Completed PPQs should be incorporated into the SF 330 directly. PPQs should not be submitted to the VHA PCAC directly. Any PPQs will not be counted towards the page limitations for this submission. However, any narratives provided for past performance in Section H will be counted toward the page limit. Knowledge of Locality (section H): Knowledge of the locality, to include specific knowledge of certain local conditions or project site features, such as geological features, climatic conditions, working with and local construction methods or local laws and regulations. The information for this factor shall be provided in Section H of the SF 330. Note that the intent of this factor is to showcase a firm s understanding of the site and locality, and NOT where the firm is located, how far away the firm/branch office is from the site, and how they would travel to the site. Information related to the firm s location shall instead be provided in Section H under Secondary Selection Criterion Factor 1, Geographic Location. See below. Experience in construction period services (section H): Experience in construction period services to include: Solicitation support services, Professional field inspections during the construction period Coordination with commissioning requirements Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include drafting statements of work and cost estimates. Attendance at weekly conference calls Providing minutes of meetings between the AE, VA, and contractors Pre-final inspection site visits Generation of punch-list reports, and Production of as-built documentation. The information for this factor shall be provided in Section H of the SF 330. Secondary Selection Criterion*: Geographic location. Location of the firm, as measured by the driving distance (miles) between the Offeror s principal business location: Department of Veteran s Affairs Medical Center 500 Foothill Drive Salt Lake City, Utahb84148 Determination of the mileage will be based on Google Maps (https://www.google.com/maps/dir/). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF 330 submission. 5. SUBMISSION REQUIREMENTS: The below information contains the instructions and format that must be followed for the submission of the SF 330 Statement of Qualifications: Submit ONE (1) SF 330 Statement of Qualifications to Contract Specialist Aline Cruthers at aline.cruthers@va.gov . This must include Parts I and II and any applicable attachments. The submission must include the SF 330, Architect-Engineer Qualifications (form is available online at http://www.cfm.va.gov/contract/ae.asp). The SF 330 submission is due by 3:00 PM EST on November 3, 2023. The SF 330 must be submitted in one email and have a file size no larger than 5 MB. No hard copies will be accepted. The subject line of the email must read: SF 330 Submission 36C77623R0155 Salt Lake City Cardiology and Administrative Support Addition Project. The SF 330 submission must not exceed a total of 50 pages. This includes title page, table of contents, and any other relevant information. Any pages submitted by an offeror that exceed the limit will not be considered during the evaluation. Each page must be in Arial size 12 font, single spaced. Part II of the SF 330 and any CPARs or PPQs will NOT count toward the page limitation. A PPQ obtained for another SF 330 submission may be submitted for this project. However, if significant portions of the project have been completed since the PPQ was filled out, a new PPQ should be submitted to accurately assess the project. Firms must include the following information in section B of the SF 330 submission: 1) SAM Unique Entity Identifier 2) Tax ID number 3) Cage code 4) Primary point of contact s email address and phone number All questions must be submitted to aline.cruthers@va.gov with the subject line SF 330 Questions - Salt Lake City Cardiology and Administrative Support Addition . The cutoff for question submission is 3:00 PM EST on October 20, 2023. Questions will be answered through modification to the pre-sol notice posted to Contract Opportunities at SAM.gov. This procurement is a 100% set-aside for SDVOSB concerns. Offers received from other than SDVOSBs will not be considered. Offerors must be certified as SDVOSBs by the U.S. Small Business Administration (SBA) and visible in the Veteran Small Business Certification (VetCert) database (https://veterans.certify.sba.gov/) at the time of SF 330 submission, written response submission, and award. Failure to be certified in the VetCert database at these times will result in the offeror being deemed ineligible for award. All joint ventures must be SBA certified at the time of SF 330 submission, written response submission, and award and must submit agreements that comply with 13 CFR 128.402 prior to contract award. All prime firms must meet the NAICS code requirement specified in this notice. The Contracting Officer will verify the NAICS code in VetCert. Failure to meet the NAICS code requirement may result in the rejection of the SF 330 submission. SF 330 submissions received after the date and time specified will not be considered. Late proposal rules per FAR 15.208 will be followed for late submittals. Firms not providing the required information may not be evaluated. All information must be included in the SF 330 submission package. It is the offeror s responsibility to check the Contract Opportunities website at SAM.gov for any revisions to this announcement prior to submitting their SF 330. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents