Similar Projects
Z--INDE 236306-Replace Chiller Plants/Cooling Towers
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19106

Air Conditioning Repair Over 50 Tons
Alteration
Bidding
Philadelphia, PA

Automatic Temperature Control Repair
Alteration
Bidding
Philadelphia, PA

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

Computer Room Upgrades - USBC
Post-Bid
Philadelphia, PA 19106

Machine Chiller Semi-Annual Preventative/Corrective Maintenance for NFPC
Results
Philadelphia, PA 19112

Chillers and Hotwater/Glycol Pipeline Replacement at Northeast Water Pollution Control Plant
Results
$4,000,000 to $5,000,000 est. value
Philadelphia, PA 19137

Auxiliary Heater Assembly
Alteration
Bidding
Philadelphia, PA

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Maintenance/Repairs - Branches and Regionals
Term Contract
Results
Philadelphia, PA

Bldg. 592 Mezzanine Ventilation Design & Installation
Post-Bid
$500,000 to $1,000,000 est. value
Philadelphia, PA

Jefferson Station Fan Replacement - MC
Results
Philadelphia, PA 19107

Heat Pump Condenser
Post-Bid
Philadelphia, PA

Exhibit Hall AHU 12A and Thru 14A and B Replacements
Results
Philadelphia, PA

Bldg 4 Rooftop Chiller Removal and Replacement
Post-Bid
Philadelphia, PA

Last Updated 04/15/2022 03:38 PM
Project Title

Design-Bid-Build (DBB), Building 633 River Water Cooling System, Philadelphia Naval Business Center (PNBC), Philadelphia, PA

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19092   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design-Bid-Build (DBB), Building 633 River Water Cooling System located at the Philadelphia Naval Business Center (PNBC), Philadelphia, Pennsylvania. The project will repair project replaces 77 year old 50,000 gpm (gallons per minute) river water cooling system with new 8,200 gpm cooling tower with capability to reject heat up to 75 MMBH (Million British Thermal Units per Hour). Adequate cooling water system with capacity to cool up to 8,200 gallons of water per minute with heat rejection of up to 75 MMBH. Cooling water is required to support RDT&E mission performed in the Building 633 Complex, including test and evaluation (T&E) of Columbia Class Program Integrated Power System. The cooling water system needs to provide a reliable source of cooling water on demand, whenever required to support testing, while minimizing environmental impacts.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents