Similar Projects
Autocamp Zion
New Construction - 8,441 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Virgin, UT 84779

SR 59 - Shoulder Widening
Infrastructure
Bidding
$1,500,000 to $3,000,000 est. value
UT

Slurry Seal 2022 Project
Infrastructure
Bidding
Washington, UT

2021 Slurry Seal Project
Post-Bid
Santa Clara, UT

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

Z--BLM-UT Red Cliffs Recreation Area Chip Seal
Results
$100,000 to $250,000 est. value
UT

2020 School Seal Coat Project
Results
Saint George, UT 84770

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Pintura MS4
Results
Pintura, UT 84720

2021 School Seal Coat Project
Infrastructure
Post-Bid
UT

SR-18; Cottonwood Upper Passing Lane Passing Lane
Results
$1,500,000 to $3,000,000 est. value
UT

Construction of a Portion of 50 South and 625 West Roads
Infrastructure
Post-Bid
Virgin, UT

2020 Gould Wash Road Project
Results
Hurricane, UT 84737

FY22 Maintenance and Repair Projects
Infrastructure
Post-Bid
Saint George, UT 84790

River Road,Riverside Drive to 1450 South
Results
$3,000,000 to $4,000,000 est. value
UT

Reported 01/21/2022 12:00 AM
Project Title

Construction of the 2800 West Roadway Construction Project

Physical Address View project details and contacts
City, State (County) Hurricane, UT 84737   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project location is in Hurricane, Utah along future 2800 West corridor (extension of SR-7) and widening of 600 North. Work consists of typical roadway construction including removal of existing features, site clearing, roadway excavation, provision and placement of base course, asphalt, curb and gutter, pedestrian ramps, sidewalk, water, sewer and drainage facilities, signing and striping, joint utility trench, etc.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents