Similar Projects
Women's Baseball Center Museum - City of Rockford
New Construction, Infrastructure
Conception
$7,000,000 CJ est. value
Rockford, IL 61101

Well 45 Reservoir Reconstruction - City of Rockford
Infrastructure
Conception
$15,000,000 CJ est. value
Rockford, IL 61102

Alpine Dam Modernization Phase 2 - City of Rockford
Infrastructure
Design
$22,400,000 CJ est. value
Rockford, IL 61101

Colman Yards Barber Colman Mixed-Use Development
New Construction, Infrastructure, Build-out - 130,000 SF
Design
$400,000,000 CJ est. value
Rockford, IL 61101

Gym Floor Asbestos Abatement
Term Contract, Infrastructure
Post-Bid
$121,000 CJ est. value
South Beloit, IL 61080

2022 Pavement Improvement Project
Infrastructure
Post-Bid
$410,000 CJ est. value
Machesney Park, IL 61115

Cargo/Distribution Facilities Developer RFQ
Renovation
Results
Rockford, IL

Hononegah High School Tennis Courts Expansion
Renovation, Infrastructure
Results
Rockton, IL 61072

Kwik Trip #1276 / South Beloit
New Construction, Infrastructure - 14,383 SF
Construction
$4,000,000 CJ est. value
South Beloit, IL 61080

Hard Rock Casino
Demolition, New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Rockford, IL 61108

Fleet Farm Retail Development
New Construction, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Rockford, IL 61112

NorthPointe Birth Center
New Construction, Infrastructure - 8,700 SF
Pending Verification
$5,115,937 CJ est. value
Roscoe, IL 61073

ENGIE Solar Farm
Infrastructure
Conception
$5,000,000 CJ est. value
Rockford, IL 61108

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Harrison Avenue Eastbound Lane Improvements 2022
Infrastructure
Results
$384,968 est. value
Cherry Valley, IL 61016

Last Updated 08/12/2023 08:34 AM
Project Title

Plaza Improvements

Physical Address View project details and contacts
City, State (County) Winnebago, IL 61088   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $3,200,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work in this contract includes ramp A pavement and shoulder replacement. removal of existing Toll Plaza median island. construction of proposed concrete barrier wall extensions, removal of existing Toll Plaza canopy, construction of proposed Toll Plaza monotube, removal of existing Toll Plaza equipment, installation of proposed Toll Plaza electrical work and lighting improvements, proposed pavement marking improvements along Ramp A, proposed signing improvements, maintenance of Traffic, restoration of landscaping for area described above, and erosion and sediment control for area described above. Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4524D.4866R_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on July 31, 2023.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents