Similar Projects
Old Highway Road Water Main Extension - Sieppel and Radford Road Loop - City of Dubuque
Infrastructure
Conception
$768,375 est. value
Dubuque, IA 52099

McFadden Farm Water Main Improvement(South Heacock Road From Chavenelle To Pennsylvania Avenue) - 740-2895 - City Of Dubuque
Infrastructure
Conception
$305,800 CJ est. value
Dubuque, IA 52002

Dubuque Community YMCA/YWCA
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Dubuque, IA 52001

Aldi - Plaza 20 / Dubuque
New Construction, Infrastructure - 20,664 SF
Design
$3,400,000 CJ est. value
Dubuque, IA 52003

Aldi #81 / Dubuque
New Construction, Infrastructure - 21,831 SF
Bidding
$4,000,000 CJ est. value
Dubuque, IA 52003

2023 Asphalt Overlay Ramp Project Four
Infrastructure
Bidding
$77,818 CJ est. value
Dubuque, IA 52001

Bee Branch Stormwater Pumping Station Project
Demolition, New Construction, Infrastructure
Post-Bid
$15,780,000 CJ est. value
Dubuque, IA 52001

Lead Hazard Control 2839 Elm Street
Term Contract, Renovation, Infrastructure
Post-Bid
$50,000 CJ est. value
Dubuque, IA 52001

HMA Resurfacing, Culvert Replacements, and Grading on Haberkorn Road
Infrastructure
Results
IA

The Meadows Clubhouse
Renovation, Alteration
Results
$1,842,600 est. value
Asbury, IA 52002

Pennsylvania Avenue Widening - City of Dubuque
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Dubuque, IA 52001

Five Flags Center - City of Dubuque
Addition, Renovation, Infrastructure
Pending Verification
$89,700,000 CJ est. value
Dubuque, IA 52001

Reconstruct Taxiway Alpha - 390-2842 - City of Dubuque
Alteration
Conception
$9,945,000 est. value
Dubuque, IA 52003

Airport Hangar 105 Construction
New Construction, Infrastructure
Bidding
$2,250,000 CJ est. value
Dubuque, IA 52003

Comiskey Park Redevelopment Project
Infrastructure
Post-Bid
$1,541,300 CJ est. value
Dubuque, IA 52001

Last Updated 03/30/2023 01:35 PM
Project Title

Five Flags Building Improvements - City of Dubuque

Physical Address View project details and contacts
City, State (County) Dubuque, IA 52001   (Dubuque County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $25,830,150 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for improvements to the building (arena, theater, lobby areas, exterior) and its equipment should a bond referendum for another scenario not pass or it is determined by City Council that Scenario 1 of status quo is the direction. This would be used on the current facility at its current footprint in its current state. The building is in need of wood window repairs, painting of the steel exterior, resealing the ballroom floor, remodeling/upgrading concession stands, carpet and tile replacement, locker shower upgrades, stage dimmer light replacement, dressing room upgrades, orchestra pit electronic lift, placement, refurbishing the stage floor, restoration of theater seats, painting walls and ceilings, satellite ticket booth , theater counter weight and grid system, lighting upgrades and retrofits and other building needs. Equipment replacement needs include the sound system, floor scrubber, tables and portable chairs, water fountains, popcorn popper, concert lighting, pipe and drape, follow spots, lighting consoles, masking equipment, scoreboard and other equipment replacements. New equipment necessary for a venue doing the level of business of Five Flags include wireless internet, point of sale system, and more. All projects listed have been submitted previously as individual projects with the oldest continuously submitted in the budget process since 2003 and the majority have been submitted and cut from the budget for 9-10 years and if approved in this CIP would be five more years until completed. Civic Center opened its doors in 1979, alongside the restored Theater paid for by a bond of $3.7 million project. Additional upgrades and renovations were completed in 2005 at a cost of just over $2.0 million. The project is included in the city's 2023-2028 Capital Improvement Program (CIP). As of March 30, 2023, information regarding engineer and architect have not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2025-2026. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents