Similar Projects
WUSD Bathroom Renovations Project
Term Contract
Post-Bid
Winslow, AZ

Plumbing and Irrigation Materials
Term Contract
Post-Bid
Tucson, AZ

Plumbing and HVAC Repair and Maintenance Services
Alteration
Results
Tempe, AZ

Roadrunner Camp Group Electrical and Plumbing Upgrades
Alteration
Results
AZ

House and Senate Capitol Projects - CMAR
Renovation, Term Contract
Post-Bid
$6,500,000 est. value
Phoenix, AZ 85007

Water Fountain Shells
Infrastructure
Results
Phoenix, AZ

Plumbing Services and Gas Appliance Maintenance
Term Contract
Post-Bid
Flagstaff, AZ

Specialty Plumbing Services
Alteration
Results
$75,000 est. value
Scottsdale, AZ

Specialty Plumbing Services
Alteration
Post-Bid
$75,000 est. value
Scottsdale, AZ

Residential Emergency Plumbing, HVAC, and Roof Repairs and Replacements
Alteration
Results
$300,000 est. value
Scottsdale, AZ

Mechanical, Electrical, Plumbing and Fire Alarm Job Order Contracting Statewide
Alteration
Post-Bid
Phoenix, AZ

North End Pavement Replacement
Infrastructure
Results
$2,784,704 CJ est. value
Yuma, AZ 85364

Plumbing Services
Alteration
Post-Bid
Phoenix, AZ 85043

Hedgepeth Waterline Improvement District 51st Avenue to 47th Avenue Behrend Drive to Tonopah Drive
Infrastructure
Results
$6,173,189 CJ est. value
Phoenix, AZ 85004

McDowell Campground Updates
Alteration
Post-Bid
$130,000 est. value
Goodyear, AZ

Last Updated 03/21/2023 07:39 PM
Project Title

Pinal County and Pima County (IR34 and IR42, Tohono O'odham Na)

Physical Address View project details and contacts
City, State (County) Comobabi, AZ 85634   (Pima County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $16,171,819 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

PN-086 PM 090 TRACS NO 086 PM 090 F0360 01C The proposed project 086 PM 090 F0360 01C is located in Pima County on SR 86 between mileposts 90.00 and 105.00 about 40 miles southeast of Why, Arizona within the Tohono O'odham Nation Indian Reservation. The proposed work consists of pavement rehabilitation of the existing asphaltic concrete roadway. The work includes milling the existing pavement and replacing with asphaltic concrete, followed by application of chip seal. A stress absorbing membrane interlayer (SAMI) will be used on mainlines. The work also includes replacing existing guardrail, embankment curb, drainage improvements, seeding, applying pavement marking and other related work. The proposed project 0000 PM ITO T0264 01C is located on the Tohono O'odham Nation along IR34 and IR42 in Pima County and Pinal County Arizona. The project is located within the Tohono O'odham Nation. The work consists of various safety improvements, including installation of new pavement markings, raised pavement markings, delineators, new signs, and other related work. AZDOT - Pinal County and Pima County (IR34 and IR42, Tohono O'odham Na) The amount programmed for this contract is $16,746,000.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents