Similar Projects
Quick Build Pedestrian Improvements Project
Infrastructure
Post-Bid
$73,500 est. value
Millbrae, CA 94030

Outdoor Improvements at Four Sites
Infrastructure, Alteration
Post-Bid
Pacifica, CA 94044

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Middle Avenue and Nealon Park Pedestrian Improvements Project
Infrastructure
Results
Menlo Park, CA

2022 Pavement Maintenance Project
Infrastructure
Post-Bid
Millbrae, CA

Hillside Boulevard Pedestrian Crossing Enhancements
Infrastructure
Results
South San Francisco, CA 94083

Beach Boulevard Public Plaza Project
Infrastructure
Post-Bid
$85,000 est. value
Pacifica, CA 94044

Midcoast Multi-Modal Trail Improvements Project
Infrastructure
Results
$3,332,000 est. value
CA

Caltrain Access and Bay Trail Gap Closure
Infrastructure
Results
South San Francisco, CA 94080

North Pacifica Pedestrian Improvement
Infrastructure
Results
Pacifica, CA

Hopkins Avenue Traffic Calming Project
Alteration
Results
$4,250,000 to $4,680,000 est. value
Redwood City, CA

2022 Sidewalk Repair Program
Infrastructure
Results
$1,000,000 est. value
Burlingame, CA

Sharon Road Sidewalk Installation Project
Infrastructure
Results
$600,000 est. value
Menlo Park, CA 94025

Citywide Street Rehabilitation Package 3-B (Phase 1) Project
Term Contract
Results
$3,100,000 est. value
San Mateo, CA

Kelly Avenue Intersections Project
Infrastructure
Results
$182,697 est. value
Half Moon Bay, CA 94019

Last Updated 07/20/2022 08:22 AM
Project Title

Parking Lot Improvements - 909-000 - San Mateo County Harbor District

Physical Address View project details and contacts
City, State (County) Half Moon Bay, CA 94019   (San Mateo County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024,
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a sidewalk / parking lot in Half Moon Bay, California. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot. Slurry & stripe parking Lots A4, B, C1, and C2. C3 and the Road include estimated costs for resurfacing. Also include additional crosswalks and installtion of EV stations. This project is in included in the San Mateo County Harbor District FY 2021-2027 Capital Improvement Plan (CIP). As of March 24, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents