Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Renovate Courtyard and ADA Improvements Illinois Central College
Infrastructure, Renovation
Bidding
$3,000,000 CJ est. value
East Peoria, IL 61611

Commodities And Services
Term Contract, Alteration
Post-Bid
Washington, IL 61571

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Lincoln ES & SHS Site Improvements
Infrastructure
Results
Morton, IL 61550

10 Miles Long and Will Consist of Drainage Improvenments along the East Fore Slope of US 24/Il 29 South of Ravine Street
Infrastructure
Results
IL

Torry Gym Exterior Improvements
Infrastructure, Renovation
Bidding
$240,000 CJ est. value
Washington, IL 61571

Sampson Street Reconstruction
Infrastructure
Post-Bid
$400,000 est. value
Tremont, IL 61568

Bridge Washing of Nine (9) Bridges Over the Illinois River
Infrastructure
Results

Panda Express / Pekin
New Construction, Infrastructure - 2,229 SF
Post-Bid
$680,000 CJ est. value
Pekin, IL 61554

State Street Paved Ditch - North Pekin
Infrastructure
Results
$80,000 est. value
North Pekin, IL 61554

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Installation of New Traffic Signals, Pavement Markings, ADA Ramp, Curb and Gutter, Riprap, Median Reconstruction
Infrastructure
Results
$649,720 CJ est. value
Pekin, IL 61554

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Agriculture Storage Building for Illinois Central College
New Construction, Infrastructure
Results
$2,297,000 CJ est. value
East Peoria, IL 61635

Last Updated 03/21/2023 09:05 PM
Project Title

Felkers Subdivision Ditch Regrading

Physical Address View project details and contacts
City, State (County) Washington, IL 61571   (Tazewell County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $92,093 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 21, 2023, this project has been awarded to Stark Excavating in the amount of $92,093.10. The City of Washington, Illinois, will receive sealed bids for the culvert cleaning and ditch regrading of the Felkers Subdivision. Award of bid is anticipated to be on March 20th, 2023. All bids must be enclosed in a sealed envelope bearing the name and address of the proposer and clearly marked as follows: Attn: City Engineer Subject: Felkers Subdivision Ditch Maintenance Bid Opening Date: Wednesday, March 15th, 2023 at 3:00 p.m. Bidder is advised this work is subject to local prevailing wage requirements. The City of Washington, Illinois, reserves the right to reject any or all bids and waive any informality in bidding.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents