Similar Projects
Reported | 08/07/2021 12:00 AM |
Project Title | I-95 Us 13 - PA 132 Interchange Ramp Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | PA (Bucks County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Part 1 Preliminary Design tasks may include but are not limited to the following: Project Management/Administration, Preliminary Design ASTA Scheduling, Public Involvement, 3D Modelling, Environmental Documentation, Surveys, Erosion and Sedimentation Control Plan, Design Field View, Safety Review Submission, Preliminary Drainage Design, Preliminary Geotechnical Engineering Report, Structure Type, Size and Location Development, Preliminary Maintenance and Protection of Traffic Plan, Utility Coordination, Grade Crossing Coordination Activities, Preliminary Highway Lighting Plan, Preliminary Pavement Marking Plan, Preliminary Traffic Signal Plan, Preliminary Signing and Sign Lighting, Preliminary Roadside Development Plan, Agency Coordination, Preliminary Pavement Design, Data Collection and Analysis, Safety Review/Audit Submission, Preliminary ROW Activities, Preliminary ROW Plans. Part 2 Final Design tasks include but are not limited to the following: Project Management/Administration, QA/QC Activities, Final Design ASTA Scheduling, Public Involvement, 3D Modelling, Roadway Geotechnical Engineering Report, Soil Profile Plan, PWD Facilities Support, Structure Foundation Reports, Final Type, Size and Location Reports, Waterway Permit Applications, Subsurface Utility Engineering, Environmental Document Reevaluation, Final Drainage Design, Final Pavement Design, Final Roadway Plans, Final Design Office Meeting, Supplemental Surveys, Cross Sections, Utility Coordination, Highway Lighting Plan, Final Structure Plans, Traffic Control Plans, Traffic Signal Timings and Plans, Pavement Marking Plans, Signing and Sign Lighting Plans, PWD Facility Design, Transportation Management Plan, Incident Management Plan, Hazardous and Residual Waste Mitigation Plan, E&S Control Plan, NPDES Permit Application, Post-Construction Stormwater Management Plan, Roadside Development Plans, Final Plans Check, Constructability Review Submission, Engineer's Estimate, Pre-Bid Construction Schedule, Pre-Bid Meeting Attendance, RULD Calculations, ITS Design, Agency Coordination, Final PS&E including ECMS Data Entry and Addenda Development. Part 3 I-95- US Route 13/PA 132 Right-of Way Acquisition Part 4 Services During Construction tasks including but not limited to: Shop Drawing Review, and Construction Consultation. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |