Similar Projects
A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Newtown Rail Trail Phase 2 Design and Engineering
Infrastructure
Bidding
Doylestown, PA

Highway Occupancy Permit Reviews
Infrastructure
Bidding

C--A-E IDIQ for Facilities Maintenance and Sustainment Support and Engineering work predominantly in the NAVFAC AOR Worldwide
Post-Bid
Less than $90,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Post-Bid
$25,000 to $100,000,000 est. value

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

Geotechnical Engineering Services
Results
$500,000 to $2,000,000 est. value

A&E IDIQ Northeast Area
Design
$1,000 to $45,000,000 est. value

Locally Owned Bridge Inspection (Penndot Hired)
Infrastructure
Bidding

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Engineering/Environmental Open End
Infrastructure
Bidding

Indefinite Delivery/Indefinite Quantity (IDIQ) procurement to acquire Architect-Engineer (AE) Services under individual task orders throughout the Mobile District Area of Responsibility (AOR) to support Mobile District Planning and Environmental Division
Post-Bid

Corrosion Engineering Services
Results
$100,000 to $13,500,000 est. value

Reported 08/07/2021 12:00 AM
Project Title

I-95 Us 13 - PA 132 Interchange Ramp Improvement Project

Physical Address View project details and contacts
City, State (County) PA   (Bucks County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Part 1 Preliminary Design tasks may include but are not limited to the following: Project Management/Administration, Preliminary Design ASTA Scheduling, Public Involvement, 3D Modelling, Environmental Documentation, Surveys, Erosion and Sedimentation Control Plan, Design Field View, Safety Review Submission, Preliminary Drainage Design, Preliminary Geotechnical Engineering Report, Structure Type, Size and Location Development, Preliminary Maintenance and Protection of Traffic Plan, Utility Coordination, Grade Crossing Coordination Activities, Preliminary Highway Lighting Plan, Preliminary Pavement Marking Plan, Preliminary Traffic Signal Plan, Preliminary Signing and Sign Lighting, Preliminary Roadside Development Plan, Agency Coordination, Preliminary Pavement Design, Data Collection and Analysis, Safety Review/Audit Submission, Preliminary ROW Activities, Preliminary ROW Plans. Part 2 Final Design tasks include but are not limited to the following: Project Management/Administration, QA/QC Activities, Final Design ASTA Scheduling, Public Involvement, 3D Modelling, Roadway Geotechnical Engineering Report, Soil Profile Plan, PWD Facilities Support, Structure Foundation Reports, Final Type, Size and Location Reports, Waterway Permit Applications, Subsurface Utility Engineering, Environmental Document Reevaluation, Final Drainage Design, Final Pavement Design, Final Roadway Plans, Final Design Office Meeting, Supplemental Surveys, Cross Sections, Utility Coordination, Highway Lighting Plan, Final Structure Plans, Traffic Control Plans, Traffic Signal Timings and Plans, Pavement Marking Plans, Signing and Sign Lighting Plans, PWD Facility Design, Transportation Management Plan, Incident Management Plan, Hazardous and Residual Waste Mitigation Plan, E&S Control Plan, NPDES Permit Application, Post-Construction Stormwater Management Plan, Roadside Development Plans, Final Plans Check, Constructability Review Submission, Engineer's Estimate, Pre-Bid Construction Schedule, Pre-Bid Meeting Attendance, RULD Calculations, ITS Design, Agency Coordination, Final PS&E including ECMS Data Entry and Addenda Development. Part 3 I-95- US Route 13/PA 132 Right-of Way Acquisition Part 4 Services During Construction tasks including but not limited to: Shop Drawing Review, and Construction Consultation.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents