Similar Projects
Lumberyard Affordable Housing Development
New Construction, Infrastructure
Design
$330,000,000 CJ est. value
Aspen, CO 81611

2022 Asphalt Overlay Project
Infrastructure
Design
$500,000 CJ est. value
Aspen, CO 81611

RFP Engineering - Castle Creek Bridge Underpass Retaining Wall Assessment and Design
Infrastructure
Bidding
$60,000 CJ est. value
Aspen, CO 81611

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Multimodal Improvements Project
Alteration
Post-Bid
Snowmass Village, CO 81611

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Countywide Chip Seal Project
Results
Aspen, CO 81611

Snowmass Water and Sanitation District Edgewood Water Line Connection
Infrastructure
Construction
$200,000 CJ est. value
Snowmass Village, CO 81615

New Terminal - Aspen-Pitkin County Airport
Addition, Infrastructure
Pending Verification
$121,800,000 CJ est. value
Aspen, CO 81611

New Terminal - Aspen-Pitkin County Airport
Addition, Infrastructure
Pending Verification
$121,800,000 CJ est. value
Aspen, CO 81611

Snowmass Center Redevelopment
Demolition, Renovation, Infrastructure - 170,101 SF
Design
$5,000,000 CJ est. value
Snowmass Village, CO 81615

2022 Countywide Paving Project
Infrastructure
Post-Bid
CO

Co Flap Pit 82(1) Brush Creek Parking Area
Results
$4,500,000 to $6,500,000 est. value
CO 81611

Aspen Valley Hospital Phase 4
New Construction, Renovation, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Aspen, CO 81611

ASE - Airfield Pavement Rehabilitation 2022
Infrastructure
Post-Bid
CO

Last Updated 11/22/2022 01:03 PM
Project Title

Brush Creek Parking Area

Physical Address View project details and contacts
City, State (County) Aspen, CO 81611   (Pitkin County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Maintenance, Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,469,775 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SOLICITATION NUMBER: 6982AF22B000026 SOLICITATION TYPE: FULL AND OPEN COMPETITION (UNRESTRICTED) PROJECT NUMBER: CO FLAP PIT 82(1) PROJECT NAME: BRUSH CREEK PARKING AREA Item 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Item 13A. Item 9: FOR GENERAL INFORMATION: E-mail us at CFLContracts@dot.gov. FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov . Item 11: COMPLETION DATE: Work shall be completed on or before the date specified in Subsection 108.01 of the SCRs. Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15 Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-14. Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee (Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP14. All bid guarantees must have original signatures with original corporate seals. Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted . Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the FP-14. ESTIMATED PRICE: The price range of the project work is between $5,000,000 and $10,000,000. BIDDERS, PLEASE NOTE: This Bid Proposal is comprised of one schedule and two options. Before preparing the bid, carefully read the Solicitation Provisions and the following: o Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government o Multiply the unit price by the quantity for each pay item and show the amount bid. When the words "Lump Sum" appear as a unit bid price, insert an amount for each lump sum pay item. o Total all amounts bid for each pay item and show the Construction Cost Total on the space provided on the last page of each schedule or option. o Also show the Construction Cost Total for each schedule/option as well as the combined Total of each Schedule and the Option in the spaces provided on the Bid Summary page. Basis for Award To be eligible for award of contract, the offeror shall submit prices for each item in Bid Schedule A, Option X and Option Y. Accordingly, contract award will be made to the lowest responsible bidder conforming to the solicitation, provided funds are available. Per FAR provision 52.217-4, Evaluation of Options Exercised at Time of Contract Award, the Government will evaluate offers for award purposes by adding the total price for Schedule A together with any Option(s) exercised at the time of award, depending on funds availability. If the determination is made to exercise any of the Options, the Contracting Officer will provide the contractor with written notice no later than 90 days after contract award, per FAR clause 52.217-7, Option for Increased Quantity- Separately Priced Line Item (MAR 1989). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Parking Spaces, 200 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents