Similar Projects
Mastodon Lake Dredging and Shoreline Restoration
Infrastructure
Design
$100,000 CJ est. value
Aurora, IL 60506

Sauk Valley Community College 2022 Abatement Project - West Toilet Rooms
Term Contract, Demolition, Infrastructure
Sub-Bidding
$79,600 CJ est. value
Dixon, IL 61021

638 Whitman Street Demolition
Demolition, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Rockford, IL 61103

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

Central Dietary - Asbestos Work
Renovation
Results
Less than $150,000 est. value
Elgin, IL 60123

New Nature Preserve Trail
New Construction
Results
Chicago Heights, IL 60411

Demolition of 3638 Rosemear Avenue
Demolition, Infrastructure
Sub-Bidding
$98,000 CJ est. value
Brookfield, IL 60513

Asbestos Abatement at Indian Creek High School
Post-Bid
Shabbona, IL 60550

Asbestos Abatement Services
Term Contract
Results
$17,250 to $39,650 est. value
Galesburg, IL

Demolition of Wastewater Treatment Structures
Demolition, Infrastructure
Sub-Bidding
$83,000 CJ est. value
Washington, IL 61571

Asbestos Abatement
Renovation
Post-Bid
Oak Forest, IL 60452

Asbestos Abatement at 2306-2308 and 2312 5th Avenue
Results
Moline, IL 61265

River Forest Buildings Demolition Project
Demolition, Infrastructure
Sub-Bidding
$113,000 CJ est. value
River Forest, IL 60305

Asbestos Abatement
Post-Bid
Calumet City, IL 60409

Last Updated 08/24/2022 10:02 AM
Project Title

Brookport Demolition Contract

Physical Address View project details and contacts
City, State (County) Brookport, IL 62910   (Massac County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $68,500 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor will remove all buildings located on the property. The Contractor shall remove all rubbish, debris, trees and undergrowth found on the tract from which the Contractor is conducting demolition. All material removed from the tract shall become the property of the Contractor and shall be disposed of at his expense in a proper and legal manner. Material must be taken directly from the demolition site to a proper disposal site. No burning of paper, refuse, general construction or demolition debris shall be permitted on the project site. All masonry walls, footings, and foundations shall be removed. All masonry/concrete floors shall be removed. All basement walls shall be removed to 2 feet below ground. A minimum 1 foot diameter hole shall be broken into the basement floor. All debris must be hauled to an approved landfill according to state and federal law. Copies of landfill receipts must be submitted to City of Brookport prior to final inspection. No bids will be considered after the bid opening on July 5th, 2022.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents